6.4.2

Close Circuit Supervision Connections

+
R
Close circuit supervision with the circuit breaker Open or Closed.
6.5

Inrush Detector (81HBL2)

This element detects the presence of high levels of 2nd Harmonic current which is indicative of transformer Inrush
current at switch-on. These currents may be above the operate level of the overcurrent elements for a short
duration and it is important that the relay does not issue an incorrect trip command for this transient network
condition.
If a magnetic inrush condition is detected operation of the overcurrent elements can be blocked.
Calculation of the magnetising inrush current level is complex. However a ratio of 20% 2
Fundamental current will meet most applications without compromising the integrity of the Overcurrent protection.
There are 3 methods of detection and blocking during the passage of magnetising inrush current.
Blocking only occurs in those phases where Inrush is detected.
Phase
Large, Single Phase Transformers – Auto-transformers.
All 3-phases are blocked if Inrush is detected in any phase.
Cross
Traditional application for most Transformers but can give delayed operation for Switch-
on to Earth Fault conditions.
Composite 2nd Harmonic content derived for all 3-phases and then compared to
Sum
Fundamental current for each individual phase.
Provides good compromise between Inrush stability and fast fault detection.
Table 6-4
Magnetic Inrush Bias
6.6

Broken Conductor / Load Imbalance (46BC)

Used to detect an open circuit condition when a conductor breaks or a mal-operation occurs in phase segregated
switchgear.
There will be little or no fault current and so overcurrent elements will not detect the condition. However the
condition can be detected because there will be a high content of NPS (unbalance) current present.
An NPS / PPS ratio > 50% will result from a Broken Conductor condition.
Operation is subject to a time delay to prevent operation for transitory effects.
©2010 Siemens Protection Devices Limited
BO
CLOSE CCT n FAIL
BI
+ve
-ve
BO 1
BO n
Remote
Alarm
7SR24

Figure 6.4-4 Close Circuit Supervision Scheme

7PG2113/4/5/6 Solkor Applications Guide
52a
CLOSE
COIL
Circuit
R
Breaker
52b
H5 Scheme Notes:
BI = 19V (30, 48, 110, 220V supply)
BI = 88V (110, 220V supply)
R = 3K3 typical
Chapter 7 Page 48 of 49
-
nd
Harmonic to

Advertisement

Table of Contents
loading

This manual is also suitable for:

7pg21137pg21157pg2116

Table of Contents