Scope Of Installation Procedures - NEC NEAX 7400 ICS Installation Manual

Table of Contents

Advertisement

3. HOW TO FOLLOW THE MANUAL
The Installation Procedure is shown by means of flowcharts with a NAP (NEC Action Procedure) Number and the
detail of the work for each step is described in the corresponding NAP.
4. SCOPE OF INSTALLATION WORKS
This manual covers the installation shown in Figure 1-2.
Note: A Battery Module (BATTM) and a TPF/MDF Module (MDFM) are also available as options. These units
have identical dimensions to a PIM.
NAP- 200-005:
CONNECTION OF BATTERIES
24 VOLT
BATTERY
CHAPTER 1
Page 2
Revision 1.0.1
Figure 1-2: Scope of Installation Procedures
AD-25182501
NAP- 200-003:
INSTALLATION OF MAIN EQUIPMENT
NAP- 200-008:
MOUNTING OF CIRCUIT CARDS
MDF
MDF CABLES
NAP- 200-006:
CABLE RUNNING
TO MDF
NAP- 200-007:
TERMINATION OF
CABLES ON MDF
NAP- 200-004:
INSTALLATION OF
PERIPHERAL EQUIPMENT
SN694
ATTCON
SN611
ATTCON
D term
TO C.O. LINE, TIE LINE
ANALOG (SINGLE-LINE)
TELEPHONE
TO TAS INDICATOR, ALARM
INDICATOR