Hitachi ZAXIS 250LC-7 Operator's Manual page 63

Table of Contents

Advertisement

Transporting with Front Attachment (in the job site)
d
WARNING: The stay (1) may fall when the pin is
removed from the stay (1).
d
CAUTION: The bucket may interfere in the stay (1)
depending on the type of the bucket. Carefully select
the bucket to be installed.
1. Fully extend the bucket cylinder, slowly roll-in the arm
(fully extend the arm cylinder) and stop at the end
position.
IMPORTANT: Perform this operation on a flat and open
field. If the bucket cylinder contacts to obstacles, the
cylinder may be damaged.
2. Let the arm tip come in contact with the ground.
3. Remove pin (2) from stay (1). Lower stay (1). Lower the
boom (light jack up operation) until pin hole (3) of the
arm side aligns with stay (1).
4. When pin hole (3) aligns, install pin (2) to the arm side.
Install retainer lock to secure stay (1).
IMPORTANT:
 If the stay is not used, the front attachment may be
damaged due to shocks during transporting.
 If the arm is operated with installing stay (1), the
boom and arm may be damaged.
TRANSPORTATION
5-3
1
3
M1U5-SL1-012
2

Advertisement

Table of Contents
loading

Table of Contents