PowMr POW-HVM5.5M User Manual page 27

Hybrid inverter
Table of Contents

Advertisement

Charger source priority: To
02
configure charger source
priority
If this inverter/charger is working in Line, Standby or Fault
mode, charger source can be programmed as below:
Solar first
Solar and Utility (default)
Only Solar
Solar residual
26
User-Defined If "User-
Defined" is selected, battery
charge voltage and low DC
cut-off voltage can be set up
in program 03,04 and 07 of
F2 group.
Standard communication
Protocol 1 for inverter
supplier
Support PYLON US2000
Protocol
Customized Protocol or
Support FOX ESS Lithium
Battery Protocol
Standard communication
Protocol 2 form inverter
supplier
Solar energy will charge
battery as first priority. Utility
will charge battery
Solar energy and utility will
charge battery at the same
time.
Solar energy and utility will
charge battery at the same
time.
Solar energy will support all
connected
loads
priority, residual energy will
charge battery.
as
first

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the POW-HVM5.5M and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF