Establishing Monitor Protocol - Thermo Scientific 5030 Instruction Manual

Synchronized hybrid ambient real-time particulate monitor
Hide thumbs Also See for 5030:
Table of Contents

Advertisement

Installation

Establishing Monitor Protocol

Establishing Monitor
Protocol
2-8
Model 5030 SHARP Monitor Instruction Manual
4. Connect the 9-pin vacuum pump control cable to the 0-10V Pump
control connector on the rear of the monitor.
5. Connect the vacuum pump power cord to a properly grounded power
supply.
6. Connect the 9-pin ambient/heater temperature assembly to the 9-pin
connector labeled "sensors" on the rear of the monitor.
7. Check connections for proper installation.
8. Set monitor power switch to the ON position.
After powering up the Model 5030, the following User Screen sequence
(from left to right) will automatically appear:
5030 SHARP v1.18
US-Version
NEXT
The initial screen information provides the instrument Model, version of
Firmware, and the Monitor Protocol (US or EU). The second screen
informs the user that the filter tape is changing. The third screen informs
the user that the Model 5030 is zeroing the mass of the filter tape and air
column, and will begin measuring the accumulated mass on the filter tape.
During this third screen, the pump should be operational.
Two (2) monitoring protocols have been written into the Model 5030
SHARP firmware. These protocols cover the United States and the
European Union. The SHARP Monitor protocol can be changed within the
first 10 seconds after the monitor is turned on by pressing the second key
from the left. The protocol remains in memory if power is interrupted and
needs to be chosen only once.
Thermo Fisher Scientific

Advertisement

Table of Contents
loading

Table of Contents