Usage
EN
10 Maintenance
De-energise the unit prior to working on it or in the event of potential danger (e. g. pull the mains
plug) and prevent it from being switched back on again.
Purge a unit with a pressure vessel completely.
10.1
Maintenance schedule
Maintenance Level I
Maintenance
interval
Annually
Annually
Annually
Annually
Maintenance Level II
Maintenance
interval
4 years or 5000
operating hours
8 years or 10000
operating hours
8 years or 10000
operating hours
12 years or
15000 operating
hours
In accordance
with national law
Videos of maintenance work can be found at: www.duerr-technik.com.
22
Maintenance work Level I (see "Maintenance, installation and repairs")
Replacement of the air intake filter cartridge – if there is a high concentration of
❯
dust, this must be done every six months (see "10.3 Replace the air intake
filter cartridge")
On units with a membrane-drying unit: Replace the 0.3 mm fine filter or the
❯
0.01 mm fine filter in the membrane-drying unit (see "10.4 Replacing the filter
of the membrane drying unit")
On units with a membrane-drying unit: Replacement of the sintered filter in
❯
the membrane-drying unit (see "10.4 Replacing the filter of the membrane dry-
ing unit")
Replacement of the activated carbon filter if present (see "10.5 Replacing the
❯
activated carbon filter (if fitted)")
Maintenance work – level II (see "Qualified Personnel Level II ")
Replacement of the cylinder / cup seal (friction pairing) (see "Service manual"
❯
or "Service manual")
Replacement of the drying unit (see "Service manual")
❯
Replacement of all plastic hoses
❯
Replacement of the compressor (see "Service manual")
❯
Performance of recurring safety inspections (e.g. pressure container inspec-
❯
tions, electrical safety inspections) in accordance with applicable national laws.
0626900100L02 2204V006
Need help?
Do you have a question about the SICOLAB 062 and is the answer not in the manual?
Questions and answers