Tools / 安装工具
Phillips/ Flat-head
Hammer drill
Adjustable wrench
Socket wrench
screwdriver
套筒扳手
活动扳手
十字 / 一字螺丝刀
Wire stripper
COAX crimping tool
Hydraulic pliers
Diagonal pliers
剥线钳
液压钳
压线钳
Measuring tape (5 m)
Protective gloves
Insulated gloves
Heat gun
卷尺(5m)
防护手套
绝缘手套
Short-handle Phillips
Electroprobe
Step ladder (2 m)
Electrician's knife
screwdriver (85 mm)
电笔
人字梯(2m)
电工刀
短柄十字螺丝刀(85mm)
Circuit breaker Layout / 空开示意图
NOTE / 说明
Cabinet dimensions (H x W x D): 2000 mm x 800 mm x 850 mm
机柜尺寸(高×宽×深):2000mm×800mm×850mm
Surge protective
device (SPD) and
SPD circuit breaker
防雷器及防雷空开
FS QFS
1QF
2QF
QF1
QF2
2
Installing a UPS PDC / 安装UPS配电柜
Checking Before Installation / 安装前检查
Check that all components listed in the packing list are intact. Ensure that all components are available before cleaning
up the packing materials. If components or fittings are damaged during transportation or do not comply with the
contract, make records onsite and contact your local Huawei office immediately. Check that the UPS PDC is in good
condition.
Claw hammer
冲击钻
打开包装箱,根据装箱清单检查设备的配件是否齐全、是否在运输过程中损坏。清除包装材料之前,要确保所有配件都
羊角锤
已找到。如设备或配件在运输中损坏或设备和配件与订货合同不符,应及时现场记录,并与华为公司当地分公司或办事
处代表联系。检查产品是否完好,有无损坏现象。
Installing the Cabinet / 安装机柜
Remove packing materials and move the cabinet from the wood pallet to the ground.
去除机柜外包装材料,将机柜从木栈板移动至地面。
Level
Determine the position for installing the cabinet. Measure the ground levelness by using a level, measure the
斜口钳
水平尺
distances shown in the following figure by using a measuring tape, and mark lines on the ground by using a marker.
规划机柜定位。用水平尺测量地面水平度,根据机柜安装孔位尺寸标注图用卷尺测量距离并画线。
Unit: mm
单位:mm
热风枪
Use a hammer drill to drill holes on the ground and install expansion bolts.
用冲击钻在地面安装孔位处钻孔并安装膨胀螺栓。
Move the cabinet to the required position. Insert the assembly bolts into the mounting holes in the cabinet and the
ground, and partially tighten the assembly bolts.
摆放机柜至固定位置。再将组合螺栓插入机柜与地面的安装孔并预紧固螺栓。
NOTE / 说明
The positions and number
of circuit breakers in the
figure are for reference
only. The actual product
prevails.
空开位置和数量仅为示意,
请以实物为准。
Input circuit breakers
输入空开
NOTE / 说明
If the cabinet is installed on a support, skip steps 2 and 3. In this case, align the mounting holes in the cabinet with
those in the support and partially tighten the assembly bolts.
如果机柜安装在支架上,步骤2、3可省略,此步骤中将机柜与支架的安装孔位对齐,用螺栓预紧固。
Adjust the anchor bolts to level the cabinet. 调节机柜支撑地脚使机柜水平。
Output circuit breakers
输出空开
Tighten the assembly bolts in diagonal order. 按对角线顺序交叉紧固螺栓。
Bottom view of the UPS PDC / UPS配电柜底部视图
NOTE / 说明
The following table lists the tightening
torque of different bolts.
各螺栓紧固扭矩说明如下表所示。
Bolts /
Recommended torque
螺栓
/ 推荐扭矩 (N· m)
M8
13
M10
27
M12
47
M16
120
NOTE / 说明
1. Level the cabinet by using a
level. 使用水平尺调整机柜水平。
2. Wrench an anchor bolt
clockwise to elevate the cabinet,
or wrench an anchor bolt
anticlockwise to lower the
cabinet. The adjustable height
ranges from 0 mm to 8 mm.
顺时针方向将机柜调高,逆时针
方向调低。地脚调节范围:
0mm~8mm。
3. Adjust four anchor bolts to
avoid damage to the cabinet.
Adjusting only one anchor bolt
may slant the cabinet.
机柜调平过程中,不要只调节一
方地脚的高度,尽量四方地脚协
调调节,以免机柜倾斜造成机柜
损坏。
3
Installing Input and Output Cables /安装输入输出线缆
Input cables / 输入接线
NOTE / 说明
Cables can be routed in from the top
and out from the bottom.
进出线方式为:上进下出。
NOTE / 说明
The ground terminal is identified with a
sign.
接地端子通常以
Front view of the UPS PDC / UPS配电柜前视图
Output cables / 输出接线