Sun Nuclear MapCHECK 3 User Manual

Sun Nuclear MapCHECK 3 User Manual

The new benchmark for 2d imrt qa
Table of Contents

Advertisement

Quick Links

®
MapCHECK
3 User Guide
The New Benchmark for 2D IMRT QA
Model 1178
Your Most Valuable QA & Dosimetry Tools

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MapCHECK 3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sun Nuclear MapCHECK 3

  • Page 1 ® MapCHECK 3 User Guide The New Benchmark for 2D IMRT QA Model 1178 Your Most Valuable QA & Dosimetry Tools...
  • Page 2 The information contained in this guide and the accompanying software program are copyrighted and all rights are reserved by Sun Nuclear Corporation. Copying, duplicating, selling, or otherwise distributing any part of this product without the prior written consent of Sun Nuclear Corporation is prohibited.
  • Page 3: Description

    Union. Sun Nuclear’s quality systems registrar and European Notified Body for Class II medical products is BSI. Sun Nuclear’s Class I medical products are listed in Europe with the Competent Authority of Germany. Sun Nuclear Corporation is an ISO 13485 certified company.
  • Page 4 This page is intentionally left blank. Preface...
  • Page 5: Table Of Contents

    Measurement ......7 MapCHECK 3 Specifications ....21 Absolute Dose for Rotational Deliveries .
  • Page 6 This page is intentionally left blank. Contents...
  • Page 7: Section 1. Introduction

    Power Data Interface (PDI) 3.0 1177150 Storage and carry case (not shown) 1178012 MapCHECK 3 User Guide (this guide, not shown) 0224011 Bulletin 02-09, Power Data Interface (PDI) 3.0 (not shown) Figure 1-1. Parts Provided with MapCHECK 3 Products, Options and Accessories Additional products, options, or accessories may be included in the shipment depending on purchase options.
  • Page 8: Mapcheck 3 Quick Start Procedure

    Using your TPS software, plan a static 10 cm x 10 cm field (or machine-specific reference) on the MapCHECK 3 phantom and export DICOM RT Dose and RT Plan files. Set up the MapCHECK 3 to the linac using the same setup as Step 6. See Position MapCHECK 3 for Measurement on page 9.
  • Page 9: Setup

    Note: The MapCHECK 3 must be used with the provided PDI 3.0, blue power and data cable, and PDI power supply. Other PDI devices (such as PDI 2.0) and other power and data cables (such as the gray cable) are not supported for use with MapCHECK 3.
  • Page 10: Overview Of Snc Patient Software

    Compare panel – compares the data loaded in Sets 1 and 2 select analysis type, analysis criteria, and comparison results displayed in Analysis panel – Compare panel. Figure 1-2. Example of MapCHECK 3 Data Displayed in SNC Patient Software Section 1. Introduction...
  • Page 11: Section 2. Operation

    Operation Temperature Equilibrium The MapCHECK 3 should be at the same temperature as the treatment room before use. If the MapCHECK 3 is not stored at treatment room temperature, allow the device to reach temperature equilibrium before acquiring measurements. Temperature in the MapCHECK 3 detector array will remain stable when the device is continuously connected to AC power;...
  • Page 12: Flattening Filter Free (Fff) Beams

    Dose Rate The radiation response of MapCHECK 3 diodes varies by up to ±1.5% with change in dose rate (100 MU/min to 1400 MU/min). Therefore, dose calibration should be performed at the dose rate that is similar to that at which QA measurements will be performed. This is especially important for flattening-filter-free (FFF) energy modes, for which the range of available dose rates is wide.
  • Page 13: Alternate Methods

    If desired, verify calculated dose by performing an ion chamber measurement under the same conditions. Alternate Methods • Acquire a CT image of MapCHECK 3 with desired buildup and import into TPS in lieu of creating a water-equivalent phantom. • Calculate known dose using a hand calculation or second-check software. The accuracy of this method greatly depends on the fidelity of the PDD, TPR, and output factor data and any conversions, interpolation, or corrections applied.
  • Page 14: Absolute Dose For Rotational Deliveries

    Create a beam with field size 10 cm x 10 cm incident on the anterior surface of the MapCHECK 3 in MapPHAN. For machines that do not support 10 cm x 10 cm field size, use machine-specific reference field size.
  • Page 15: Deliver Absolute Dose Calibration Measurement

    Place MapCHECK 3 on treatment couch with +Y toward gantry. Align lasers to the MapCHECK 3 X and Y markings. If the area of interest is not centered on the beam central axis (CAX), such as an asymmetrical field, the MapCHECK 3 can be positioned off-center.
  • Page 16: Measurement With Mapphan Accessory

    MapCHECK 3 to the coronal laser. See Detector Plane Marking on page 19. Add enough buildup to the device’s inherent buildup to create total buildup equal to the planned dose depth. The MapCHECK 3 is capable of physically supporting up to 30 g/cm buildup. Do not exceed this amount.
  • Page 17: Mapcheck 3 Measurement File Formats

    Note: Back up all measurement files on a regular basis. MapCHECK 3 Measurement File Formats By default, two types of files are saved for each MapCHECK 3 measurement, a text file (*.txt) and a multi-frame (movie) file (*.mcm). A corrected movie file (*.mcmd) can also be saved by default if the option is enabled in program preferences (select Setup >...
  • Page 18: Compare Device Measured To Planned Dose

    WARNING: SNC Patient software interpolates planned dose data to 1 mm for DTA and Gamma analysis. For best results in high dose gradient regions, initial grid spacing should be ≤3 mm. If planned dose grid spacing is > 4 mm, import is prohibited. If prompted for MU or scaling factor, enter the information needed to convert the proper values to dose delivered.
  • Page 19: Section 3. Support And Maintenance

    Do not use any solvents or abrasive cleaners. Do not immerse MapCHECK 3 in any fluid. Do not permit liquid to flow on the device or any associated parts or accessories, or into any cavity.
  • Page 20: Maintaining Firmware

    Maintaining Firmware Although MapCHECK 3 contains the latest firmware version when shipped, upgrades may become available to add features, improve operation, or correct issues. Firmware updates are distributed with each software version. See the Firmware Upgrade instructions in the SNC Patient Software Reference Guide or online Help.
  • Page 21: Shutdown

    Submit a support request using our online form. See Support Website below. Support Website Open an internet browser and navigate to sunnuclear.com/support. Enter your email address and the serial number of any Sun Nuclear device used at your facility, then click Log in to open the Support Dashboard. •...
  • Page 22 This page is intentionally left blank. Section 3. Support and Maintenance...
  • Page 23: Section 4. Hardware Reference

    Hardware Reference Top and Bottom Panels Setup and Detector array Electronics Connector calibration markers panel Figure 4-1. MapCHECK 3 Top Panel Threaded hole for Threaded hole for IMF/GMF IMF/GMF mounting mounting Detector array Electronics Threaded hole for Threaded hole for...
  • Page 24: Detector Array

    Figure 4-3. Detector Array Markers Connector Panel The MapCHECK 3 connector panel has a power and data connector (PDI), a coaxial connector for a reference detector (Ref), and an indicator LED (Status). The reference detector input is only intended for MapCHECK 3 manufacturing testing.
  • Page 25: Status Led

    The housing seam is the Detector Plane marking that corresponds to the active region of the diode detectors and aligns to the coronal lasers. 1.20 cm from top surface to detector plane 1.83 cm from back of device plate to detector plane Figure 4-5. MapCHECK 3 Side Panel ‘Detector Plane’ Marking Detector Plane Marking...
  • Page 26 This page is intentionally left blank. Section 4. Hardware Reference...
  • Page 27: Section 5. Specifications

    • Free hard disk space = 5 GB • USB port = one v2.0 • Video RAM = 32 MB • Display resolution = 1280 x 1024 • Color depth = 32-bit • OpenGL hardware accelerated video card MapCHECK 3 Specifications Category Characteristic Specification Diode Detectors Quantity...
  • Page 28 500 mA Typical operating power Connectors/ Power and data 8 pin DIN, provides power to MapCHECK 3 and bi-direc- indicators tional serial data between computer and MapCHECK 3 One LED on electronics end panel. See Status LED on page 19.
  • Page 29: Appendix A: Regulatory Supplement

    Appendix A: Regulatory Supplement Sun Nuclear Corporation Symbols The following symbols are used in this document and in Sun Nuclear Corporation’s product labels. WARNING: This symbol indicates a risk of electric shock. (EN ISO 7010, W012) WARNING: This symbol indicates a hazard that could result in major injury or equipment damage.
  • Page 30: Operator Responsibility

    Alexandria NSW 2015 Australia Modifications to Equipment Any changes or modifications to the device that are not expressly approved by Sun Nuclear Corporation could void the warranty. Interaction with Other Electrical Equipment The device complies with EN 61326-1, Electromagnetic Performance and FCC Part 15 Class A standards.
  • Page 32 Sun Nuclear Corporation +1 321 259 6862 3275 Suntree Boulevard sunnuclear.com Melbourne, FL 32940 USA...

This manual is also suitable for:

1178

Table of Contents

Save PDF