Do you have a question about the RS 25/6JG-130 and is the answer not in the manual?
Questions and answers
Summary of Contents for BOILER-M8 RS 25/6JG-130
Page 1
Prior to installation, please read these installation and operating instructions carefully. The product warranty requires the installation and commissioning of Boiler-m8 circulating pumps to be carried out by a qualified installer in compliance with BS 7593:2019 and all local building regulations and accepted codes of practice in force at the time of installation.
The installation must be completed by a qualified engineer in accordance with BS 7593:2019 2. Application Boiler-m8 B-Rated circulation pumps are designed for the circulation of water in heating systems that are installed, commissioned and operated to BS 7593:2019.
Replacement Pump Head Easy Installation & Quick Commissioning • Boiler-m8 Universal Pump Head is easy to fit to a UPS base. Take care to isolate any electrical supply before removing the four bolts holding the end-of-life head in position, and refit the Boiler-m8 replacement, before reconnecting the electrical supply and commissioning in compliance with BS7593:2019.
5. Control Panel 5.1 Pump Setting Indicators Boiler-m8 B-Rated central heating circulating pumps have 3 speed settings which can be selected with the lever on top of the control box. The current setting is indicated by the markings on the control box that correspond to the position of the selector.
Power is on 4. Insufficient a) The pump performance and speed Increase the setting. Flow is too low. selector is set. Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com Altrincham, Cheshire WA14 2PX 0333 305 8210...
8. Installation The pump MUST be installed with the motor shaft in the horizontal Attention: position to prevent air from collecting within the pump head. www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
Page 10
The system liquid may be scalding hot and under the high pressure. Drain the system or close the isolating valves on either side of the pump before removing the pump or pump head. WARNING Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com...
Page 11
Attention: Fit the two seals between the pump and the pump valves. www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
Page 12
Pump shaft in the horizontal plane Vent the pump after installation using a flat head screwdriver Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com Altrincham, Cheshire WA14 2PX 0333 305 8210...
Page 13
Venting the pump, please take care as the liquid may be very hot. WARNING Attention: The pump must not be allowed to run dry. www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
9. Warranty Registration Register your warranty at: Or visit: https://boiler-m8.com/warranty-registration Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com Altrincham, Cheshire WA14 2PX 0333 305 8210...
Page 15
Boiler-m8 Defender-2 Magnetic Boiler System Filter 22mm • High strength magnet • Built in drain off port with hose connection • Manufactured from PA66 Polymer • Brass Diverter and Full Bore Brass Isolating Valves Boiler-m8 System Health Inhibitor Concentrate 500ml •...
Need help?
Do you have a question about the RS 25/6JG-130 and is the answer not in the manual?
Questions and answers