BOILER-M8 RS 25/6JG-130 Installation & Operating Manual

BOILER-M8 RS 25/6JG-130 Installation & Operating Manual

Universal circulator pump head

Advertisement

B-RATED
EEI ≤ 0.23
Boiler-m8
Universal Circulator Pump Head
Installation & Operating Manual
Prior to installation, please read these installation and operating
instructions carefully. The product warranty requires the
installation and commissioning of Boiler-m8 circulating pumps to
be carried out by a qualified installer in compliance with
BS 7593:2019 and all local building regulations and accepted
codes of practice in force at the time of installation.
Failure to follow the correct installation or use of the product for
WARNING
any purpose outside of the manufacturers intended design will
Boiler-m8®
www.boiler-m8.com
invalidate the product warranty.
Suite 11 Peel House, 30 The Downs,
sales@boiler-m8.com
1
Altrincham, Cheshire WA14 2PX
0333 305 8210
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RS 25/6JG-130 and is the answer not in the manual?

Questions and answers

Summary of Contents for BOILER-M8 RS 25/6JG-130

  • Page 1 Prior to installation, please read these installation and operating instructions carefully. The product warranty requires the installation and commissioning of Boiler-m8 circulating pumps to be carried out by a qualified installer in compliance with BS 7593:2019 and all local building regulations and accepted codes of practice in force at the time of installation.
  • Page 2: Table Of Contents

    5. Control Panel ................ 5 5.1 Pump Setting Indicators  ................5 6. Performance Drawing ............6 7. Fault Finding Chart ............... 7 8. Installation ................8 9. Warranty Registration ............13 Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com Altrincham, Cheshire WA14 2PX 0333 305 8210...
  • Page 3: General Information

    The installation must be completed by a qualified engineer in accordance with BS 7593:2019 2. Application Boiler-m8 B-Rated circulation pumps are designed for the circulation of water in heating systems that are installed, commissioned and operated to BS 7593:2019.
  • Page 4: Advantages

    Replacement Pump Head Easy Installation & Quick Commissioning • Boiler-m8 Universal Pump Head is easy to fit to a UPS base. Take care to isolate any electrical supply before removing the four bolts holding the end-of-life head in position, and refit the Boiler-m8 replacement, before reconnecting the electrical supply and commissioning in compliance with BS7593:2019.
  • Page 5: Product Key (Fig.1)

    4. Product Key (Fig.1) Air Vent Base/Impeller Housing Motor Housing Control Panel Model Rating Label www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
  • Page 6: Understanding The Model Code

    5. Control Panel 5.1 Pump Setting Indicators Boiler-m8 B-Rated central heating circulating pumps have 3 speed settings which can be selected with the lever on top of the control box. The current setting is indicated by the markings on the control box that correspond to the position of the selector.
  • Page 7: Performance Drawing

    6. Relation between Pump Setting and Pump Performance Speed Setting 1 46w - 3m Head Speed Setting 2 67w - 5m Head Speed Setting 3 93w - 6m Head www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
  • Page 8: Fault Finding Chart

    Power is on 4. Insufficient a) The pump performance and speed Increase the setting. Flow is too low. selector is set. Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com Altrincham, Cheshire WA14 2PX 0333 305 8210...
  • Page 9: Installation

    8. Installation The pump MUST be installed with the motor shaft in the horizontal Attention: position to prevent air from collecting within the pump head. www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
  • Page 10 The system liquid may be scalding hot and under the high pressure. Drain the system or close the isolating valves on either side of the pump before removing the pump or pump head. WARNING Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com...
  • Page 11 Attention: Fit the two seals between the pump and the pump valves. www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
  • Page 12 Pump shaft in the horizontal plane Vent the pump after installation using a flat head screwdriver Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com Altrincham, Cheshire WA14 2PX 0333 305 8210...
  • Page 13 Venting the pump, please take care as the liquid may be very hot. WARNING Attention: The pump must not be allowed to run dry. www.boiler-m8.com Boiler-m8® sales@boiler-m8.com Suite 11 Peel House, 30 The Downs, 0333 305 8210 Altrincham, Cheshire WA14 2PX...
  • Page 14: Warranty Registration

    9. Warranty Registration Register your warranty at: Or visit: https://boiler-m8.com/warranty-registration Boiler-m8® www.boiler-m8.com Suite 11 Peel House, 30 The Downs, sales@boiler-m8.com Altrincham, Cheshire WA14 2PX 0333 305 8210...
  • Page 15 Boiler-m8 Defender-2 Magnetic Boiler System Filter 22mm • High strength magnet • Built in drain off port with hose connection • Manufactured from PA66 Polymer • Brass Diverter and Full Bore Brass Isolating Valves Boiler-m8 System Health Inhibitor Concentrate 500ml •...
  • Page 16 FOLLOW US ON SOCIAL M E DIA /BOILERM8...

This manual is also suitable for:

1908 0271B-rated

Table of Contents