Chapter 2 Installing Bbu-Plus3; Installation Procedure; Putting Setup Date Label - NEC N8103-110 User Manual

Additional battery
Table of Contents

Advertisement

Chapter 2 Installing BBU
This chapter describes the installation of the BBU in the server.

1. Installation Procedure

To install the BBU in the RAID Controller, see the following procedure.
Before the installation, refer to the User's Guide of the RAID Controller and
that of the server.
This installation procedure below isn't needed if additional battery is installed to
Check
RAID controller already.

1-1. Putting Setup Date Label

Fill the year and month when the BBU is installed in the RAID Controller on the battery
label coming with the cover.
We suggest to fill in the accessory one and put it to the place that you notice easily such as
system case.
Fill Year and Month
before installation
Set up Date
Y 2009 .M 02
The life of the battery is about 2 years while it varies depending on the use
environment and operating conditions. If the battery pack is used after its life,
the maximum data backup time (72 hours) cannot be secured. Replace such a
Notice
battery pack with a new one as soon as possible following "Chapter 3
Operation and Maintenance."
Fill the year and month
2009
02
Ex) Y
.M

Advertisement

Table of Contents
loading

Table of Contents