Dell S5000 Series Installation Manual

Dell S5000 Series Installation Manual

Servers for sap hana
Hide thumbs Also See for S5000 Series:

Advertisement

Quick Links

Dell S5000 Series Servers for SAP HANA
Installation Guide
Regulatory Model: M3S2G8, M3UX16
September 2022
Rev. A01

Advertisement

Table of Contents
loading

Summary of Contents for Dell S5000 Series

  • Page 1 Dell S5000 Series Servers for SAP HANA Installation Guide Regulatory Model: M3S2G8, M3UX16 September 2022 Rev. A01...
  • Page 2 Copyright © 2022 Dell Inc. or its subsidiaries. All rights reserved. Dell Technologies, Dell, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other trademarks may be trademarks of their respective owners.
  • Page 3 Intended audience This document is intended for use by administrators and operators. Related documents For the most recent product information, documentation, firmware updates, software fixes, and service offers, see the Dell Technologies Support Site.
  • Page 5: Table Of Contents

    Table of Contents Chapter 1. Checking the Delivery Contents ........1.1.
  • Page 7: Checking The Delivery Contents

    Chapter 1. Checking the Delivery Contents D049 DANGER D049: The product must not be used in life support system or other applications where failure could threaten injury or life, and any such use voids the limited warranty associated to the product. Important ATTENTION: Please read carefully the safety instructions before you perform the procedures described in this manual.
  • Page 8: Identifying The Server

    1.2. Identifying the Server 1.2.1. Identifying the Server Model The server model is provided on the safety label on the side of the server. Model Name Commercial Name M3S2G8 S5408 server M3XU16 UBox 1.2.2. Identifying Server Modules Server modules are identified by an identification label. The label gives the MAC address of the BMC embedded management controller.
  • Page 9 Secondary Label Example Front view A label is also available at the front, behind the bezel. Chapter 1. Checking the Delivery Contents...
  • Page 10: Checking Safety Labels

    1.3. Checking Safety Labels Safety warning labels, including safety notices and graphic symbols, are visible on the server. Check that the electrical installation in place complies with the label details. 1.3.1. Server Module Labels Server Identification Label The label is located on the side of the server. Mark Description Certification information...
  • Page 11 W071 WARNING W071: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference and (2) this device must accept any interference received including interference that may cause undesired operation Server Module Identification Label Rear view The label is located inside a little drawer.
  • Page 12 C044 CAUTION C044: This unit has more than one power supply cord. Disconnect all power supply cords from the unit before servicing. Proceed as follows: 1. Power OFF the system 2. Switch OFF the site power breakers 3. Remove all power supply cords from the system Electrical Hazard Symbol: Indicates risk of electric shock.
  • Page 13: Ubox Labels

    1.3.2. UBox Labels Identification label for the UBox The label is located on the side of the server. Mark Description Recycling symbol: it is mandatory to reuse and recycle electronic and electrical equipment properly Electric hazard symbol: Caution! Risk of electric shock Multiple power sources symbol: Caution! The system has more than one power source which must all be disconnected before servicing to avoid shock hazard...
  • Page 14 W071 WARNING W071: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference and (2) this device must accept any interference received including interference that may cause undesired operation UBox Onboard Battery Label C003 CAUTION...
  • Page 15 C044 CAUTION C044: This unit has more than one power supply cord. Disconnect all power supply cords from the unit before servicing. Proceed as follows: 1. Power OFF the system 2. Switch OFF the site power breakers 3. Remove all power supply cords from the system Chapter 1.
  • Page 17: Installing The Server In The Rack Cabinet

    Chapter 2. Installing the Server in the Rack Cabinet 2.1. Installing a S5408 Server D048 DANGER D048: The server weighs 160 kg when fully populated. Important The server is delivered fully populated. It is mandatory to use a lifting device to install it. However, it is possible to reduce the server weight by removing the components from the compute box.
  • Page 18 2. Adjust the length of each rail. 3. Tighten the screws of each rail. Installation Guide...
  • Page 19 2. From the front, install the left rail Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 20 3. From the front, install the right rail Installation Guide...
  • Page 21 4. Install the server 1. Insert the server into the rack cabinet. Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 22 2. Push the server until the front face is 5 cm from the rack cabinet edge. 3. Insert two cage nuts in the rack cabinet frames for the upper server screws. 4. Push the server until it stops. Installation Guide...
  • Page 23 5. Secure the server into place Tighten the four captive screws. Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 24: Installing A S5416 Server

    2.2. Installing a S5416 Server D055 DANGER D055: The server weighs 415 kg when fully populated. Required tools • T10 Torx screwdriver • T20 Torx screwdriver • T25 Torx screwdriver • PH1 Cross-headed screwdriver • Flat screwdriver • Lifting device •...
  • Page 25 2. Adjust the length of each rail. 3. Tighten the screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 26 2. From the front, install one left rail at the bottom of the rack (rack slot 1) 2-10 Installation Guide...
  • Page 27 3. From the front, install one right rail at the bottom of the rack (rack slot 1) Chapter 2. Installing the Server in the Rack Cabinet 2-11...
  • Page 28 4. From the front, install the second left rail at the rack slot 14 Perform the same operations as when installing the first rail. 2-12 Installation Guide...
  • Page 29 5. From the front, install the second right rail at the rack slot 14 Perform the same operations as when installing the first rail. Chapter 2. Installing the Server in the Rack Cabinet 2-13...
  • Page 30: Installing The Rails For The Ubox(Es)

    2.2.2. Installing the Rails for the Ubox(es) Note There are two types of rails: one for the DellS5408 server assemblies and one for the Ubox(es). Procedure 1. Prepare the rails 1. Loosen the screws of each rail. 2. Adjust the length of each rail. 2-14 Installation Guide...
  • Page 31 3. Tighten the screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet 2-15...
  • Page 32 2. From the front, install the left rail at the rack slot 9 2-16 Installation Guide...
  • Page 33 3. From the front, install the right rail at the rack slot 9 Chapter 2. Installing the Server in the Rack Cabinet 2-17...
  • Page 34: Installing All The Chassis

    2.2.3. Installing all the Chassis Procedure 1. Install the first S5408 server assembly at the bottom of the rack 1. Insert the assembly into the rack cabinet. 2-18 Installation Guide...
  • Page 35 2. Push the server until the front face is 5 cm from the rack cabinet edge. 3. Insert two cage nuts in the rack cabinet frames for the upper server screws. 4. Push the server until it stops. Chapter 2. Installing the Server in the Rack Cabinet 2-19...
  • Page 36 2. Secure the server into place Tighten the four captive screws. 2-20 Installation Guide...
  • Page 37 3. Install the empty UBox at the rack slot 9 1. Insert the UBox into the rack cabinet. 2. Push the UBox until it stops. 4. Secure the UBox in place Tighten the four captive screws. Chapter 2. Installing the Server in the Rack Cabinet 2-21...
  • Page 38 5. Install the second S5408 server assembly at the rack slot 14 Perform the same operations as when installing the bottom assembly. 2-22 Installation Guide...
  • Page 39 6. Install the UBox alignment brackets The alignment brackets are used to fix the UBox to the S5408 server assemblies. Rear view 1. If present, remove the top and bottom PSUs on the left-hand side of the UBox. Chapter 2. Installing the Server in the Rack Cabinet 2-23...
  • Page 40 2. Position the alignment brackets using the guide pin. 3. Tighten the screws. 2-24 Installation Guide...
  • Page 41 4. If required, install the top and bottom PSUs on the left-hand side of the UBox. Chapter 2. Installing the Server in the Rack Cabinet 2-25...
  • Page 42: Installing The 8-Module Connecting Box

    2.2.4. Installing the 8-Module Connecting Box Procedure 1. Take hold of the new component 2. Remove the cover from the 8-module connecting box 1. Loosen the fixing pins (A) and the captive screws (B). 2-26 Installation Guide...
  • Page 43 2. Remove the cover using the handles (C). Chapter 2. Installing the Server in the Rack Cabinet 2-27...
  • Page 44 3. Partially insert the 8-module connecting box into its location Watch out for the position of the 8-module connecting box. Rear view 2-28 Installation Guide...
  • Page 45 4. Remove the shipping brackets Four brackets are installed for shipment and must be removed. 1. Loosen the captive screws. 2. Remove the brackets. Chapter 2. Installing the Server in the Rack Cabinet 2-29...
  • Page 46 5. Secure the 8-module connecting box in place 1. Push the 8-module connecting box completely in. 2-30 Installation Guide...
  • Page 47 2. Tighten the captive screws (A) and fixing pins (B). Chapter 2. Installing the Server in the Rack Cabinet 2-31...
  • Page 48 6. Install the cover 1. Install the cover using the handles (C). 2. Secure the cover in place by tightening the fixing pins (A) and the captive screws (B). 2-32 Installation Guide...
  • Page 49: Installing The Ubox Components

    7. Install all the UBox PSUs For each UBox PSU, perform the following steps: 1. Check the UBox PSU position Look at the label inside the PSU slot. 2. Press the latch of the UBox PSU 3. Push the UBox PSU in using the handle 4.
  • Page 50 2. Insert the UNB module and push it completely in. 3. Close the handles. 4. Tighten the handle captive screws. 2-34 Installation Guide...
  • Page 51 3. Install all the SCI modules For each SCI module, perform the following steps: 1. Check the handle of the SCI module is in the open position 2. Insert the SCI module and push it completely 3. Close the handle 4.
  • Page 52 2. Insert the LMB module and push it completely 3. Close the handles 4. Tighten the captive screw on the handles 2-36 Installation Guide...
  • Page 53 5. Install the CLKB modules For each CLKB module perform the following steps: 1. Insert the CLKB module 2. Push it completely 6. Install all the UNB fan modules For each UNB fan module, perform the following steps: Insert the UNB fan module and push it completely in using the handle. Chapter 2.
  • Page 54 7. Install the UBox bezel 1. Position the bezel. 2. Check the pilot pin (B) is aligned with the hole (c ). 3. Tighten the captive screws (A). 2-38 Installation Guide...
  • Page 55: Appendix A. Installing A Lightened Server

    Appendix A. Installing a Lightened Server D048 DANGER D048: The server weighs 160 kg when fully populated. The server is delivered fully populated. It is possible to reduce the server weight by removing the components from the compute box. However it is mandatory to use a lifting device.
  • Page 56 3. Pull the handles down at the same time to release the main box. 4. Pull the main box out of the compute box by the handles. 3. Remove the main box from the compute box Installation Guide...
  • Page 57 4. Unlock the latch of the PCIe blade 5. Take hold of the handle and carefully remove the PCIe blade 6. Pull the latch of the PSU up Appendix A. Installing a Lightened Server...
  • Page 58 7. Take hold of the handle and carefully remove the PSU Installation Guide...
  • Page 59: Installing The Compute Box In The Rack Cabinet

    A.2. Installing the Compute Box in the Rack Cabinet Proceed in the same way as for the fully populated server. It is mandatory to use a lifting device. 1. From the front, install the compute box 2. Secure the compute box in place by tightening the captive screws Appendix A.
  • Page 60: Installing The Components Into The Compute Box

    A.3. Installing the Components into the Compute Box 1. Carefully install the main boxes, all the PCIe blades and the PSUs 2. From the front, insert the main box into the compute box 3. Secure the main box in place 1.
  • Page 61 2. Tighten both captive screws. 4. Install the PSUs at the rear 1. Look at the labels on the PSU slot sides to check the PSU positions. 2. Position a PSU in the slot on the left hand side with the latch (B) at the bottom.
  • Page 62 4. Push the PSU using the handle (A) until the latch (B) locks. 5. Position a PSU in the slot on the right hand side with the latch (B) at the top. Rear view 6. Take hold the PSU by the handle (A). 7.
  • Page 63 5. Locate all the PCIe blades slots for a module Rear view 6. Install all the PCIe blades For all PCIe blades: 1. Unlock the latch. Appendix A. Installing a Lightened Server...
  • Page 64 2. Insert the PCIe blade into the compute box using the handle. 3. Check that the latch is closed. A-10 Installation Guide...
  • Page 65: Appendix B. Nuts, Screws And Washers

    Appendix B. Nuts, Screws and Washers This appendix describes all nuts, screws and washers included in the delivery. Screws Mark Head Body Diameter Length Description 5 mm 16 mm M5x16 CBL head thread forming screw 4 mm 10 mm M4x10 SS Flat-head socket cap screw 4 mm 10 mm M4x10 Low Profile SS head cap screw Washers...