Samsung IWA Series Installation Manual

Samsung IWA Series Installation Manual

Led display
Hide thumbs Also See for IWA Series:

Advertisement

LED Display Installation Manual
IWA / IFA Series
LH0**IWA*W*
LH0**IFA*VS
Ver. 3.3
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

Summary of Contents for Samsung IWA Series

  • Page 1 LED Display Installation Manual IWA / IFA Series LH0**IWA*W* LH0**IFA*VS Ver. 3.3 LED R&D Lab(VD)
  • Page 2 Revision History Version Date (Y/M/D) Description 2021/04/12 New Release 2021/04/26 Mech & S-box Update 2021/05/05 New Installation spec Update Apply NADO request.(P.37, P.123-125, P.144-146) 2021/07/25 Apply CX request. (Use of cable-less instead of pillar.) Apply GTS request. (P.124, P126-146) 2021/07/19 Change term of OC cable to OCM cable.
  • Page 3 Revision History Version Date (Y/M/D) Description Max number of power daisy chain is changed because of docking connector limitation. 2022/02/11 Only power connection from docking can be cut by physical switch externally. 2022/02/15 Update AC Power Cord, cable and OCM cable were removed. Max number of power daisy chain is changed because of docking connector limitation.
  • Page 4 ∙ Case when vacuum packaging is already unsealed before unpacking products. ∙ Case when environment condition is worse than Samsung working condition (0°C~40°C/10~80%RH). ∙ Case when it elapses longer than 7 days after unpacking them, even though the environment condition satisfies Samsung working condition (0°C~40°C/10~80%RH).
  • Page 5 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during installation  How to install the screen in the case that dehumidification is necessary ※ Before finishing the directions explained in next pages, never play other contents or use them. ※...
  • Page 6 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during installation  How to install the screen in the case that dehumidification is necessary. S-Box should play only this pattern. 3.
  • Page 7 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during operation • Electrical short in package is possible to happen during products are working. • For keeping quality of products during installation, please refer below cautions.
  • Page 8 Please print this page and hand it to user. Dew condensation due to overcooling  Even though meet with Samsung recommended operation condition, dew condensation is possible to happen when surface of products is colder than environment temperature or hot & humid air blow to cooled surface of products.
  • Page 9 This contents must be noticed to customer. Please print this page and hand it to user. Prevention of condensation by Air Conditioner  Do not let cold wind hit the screen directly. - If cold wind from the screen surface A/C directly touches, condensation may form depending on the ambient humidity and the temperature of the screen.
  • Page 10 Mandatory conformation guide before installation • Power cable and OCM cable must be firmly inserted . • When installing the cabinet (IWA), do not use the cabinet with different LED rank and film rank. • Each cabinet has its own LED/Film Rank information It must be installed as a set of the same rank. ※...
  • Page 11: Table Of Contents

    Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet + Frame Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-Box Installation and Connection 9. Connections – Power and Signal 10.
  • Page 12: Product Information And Installation Precautions

    (Same installation specifications for each pitch) Model Product appearance and information IWA / IFA series IWA Series : CoB Type / 120Hz Refresh Rate Compatible S-Box : *SNOW-AAE Only Remark IFA Series : Package Type / 60Hz Refresh Rate Compatible S-Box : SNOW-JAU, SNOW-JMU,SNOW-RAF,*SNOW-AAE * SNOW-AAE model is expected to be developed in June, 2021.
  • Page 13: Product Information And Installation Precautions

    1. Product Information and Installation Precautions ◆ Product Specification (IWA) Spec P0.84 P1.26 P1.68 806.4 Size (mm) 453.6 Resolutions 4 X 3, 12EA Module Quantity Weight 11.5 kg 11.2 kg (Cabinet) Cabinets Power Consumption 140W 140W 150W 110V Maximum Connection 10EA Quantity 220V...
  • Page 14 1. Product Information and Installation Precautions ◆ Product Specification (IFA) Spec P2.1 P2.52 P4.2 806.4 Size (mm) 453.6 Resolutions 4 X 3, 12EA Module Quantity Weight 12 kg 11.7 kg (Cabinet) Cabinets Power Consumption 240W 210W 210W 110V Maximum Connection Quantity 220V ※...
  • Page 15 1. Product Information and Installation Precautions ◆ Frame Kit Composition Installation Type Division Frame Kit Remark configuration (9 Set) VG-LFA33SWW Fixed Full kit (16 Set) VG-LFA44SWW VG-LFA55SWW (25 Set) Horizontal bar VG-LFAH8SWW Level 1 VG-LFAV1SWW Level 2 VG-LFAV2SWW Unfixed Vertical bar Level 3 VG-LFAV3SWW (Frame)
  • Page 16 1. Product Information and Installation Precautions ◆ SBB-SNOWJAU, SBB-SNOWJMU, SBB-SNOWRAF ◆ Cabinet Product Info (S-Box, I/G) <S-Box / IG > ◆ SBB-SNOWAAE IFA(P4.2) (S-Box, I/G) <S-Box / IG > LED R&D Lab(VD)
  • Page 17 1. Product Information and Installation Precautions ◆ Precautions for Installation (LED Damage) Cautions Image [Beware of Outside Impact, Fall] ① Beware not to cause any impact on the LED screen or drop the product on MODULE the floor after the protection gets taken off for installation. Front ①...
  • Page 18 1. Product Information and Installation Precautions ◆ Precautions for Installation (LED Damage) Cautions Image [Beware of liquid damage to the LED] If water or various chemicals come into contact with the LED, the inside of the LED can be damaged. ①...
  • Page 19 1. Product Information and Installation Precautions ◇ Caution for cleaning screen ( ※ IWA Only ) ★Caution★ - Watch out for damage when cleaning gap between Half- Cabinets - Watch out for damage when cleaning gap between Modules - Do not insert any cleaning tool or spay cleaner directly into the gap - It is recommended to wipe with a soft cleaning cloth provided with the product.
  • Page 20 ◆ A guide for radiant heat Written under ‘Video, (back light 10)’ standard  Installation Condition Standard for using SAMSUNG FRAME KIT In principle, solar window direct radiation condition installation is avoided. Room temperature is recommended to be less than 25 ℃.
  • Page 21 • Flow calculation and FAN selection example – Select model and screen configuration from the following site https://displaysolutions.samsung.com/support/tools/led-configurator – PDF download after login – If the flow rate is indicated, it is necessary to install a fan and air conditioner.
  • Page 22 1. Product Information and Installation Precautions • Vertical wall installation (if fan is not applied) set ~ ceiling At least 30mm Air vent area set ~ floor At least 30mm LED R&D Lab(VD)
  • Page 23 1. Product Information and Installation Precautions • Recessed installation (if fan is not applied) Recommended condition: 500mm or more set ~ ceiling Air vent area At least 30mm (Aperture ratio 100%) Minimum Separation Distance ※ If aperture ratio is not 100%, Aperture ratio Separation Distance = (%) / 100...
  • Page 24 1. Product Information and Installation Precautions • Vertical wall installation (when fan is applied) set ~ ceiling At least 30mm Sealed except for FAN Left and right side sealing Air vent area set ~ floor At least 30mm LED R&D Lab(VD)
  • Page 25 1. Product Information and Installation Precautions • Recessed installation (when fan is applied) Recommended condition: 500mm or more set ~ ceiling At least 30mm Sealed except for FAN (Aperture ratio 100%) Left and right side sealing Minimum Separation Distance ※ If aperture ratio is not 100%, Aperture ratio Separation Distance = (%) / 100...
  • Page 26 1. Product Information and Installation Precautions • Notes on Recessed installation 150mm left and right space required for serviceability. (Fig.1)  Due to the characteristics of the product, the fixing screw is placed inside, so it is necessary to secure a field of view of about 150mm. (Fig.2) ...
  • Page 27 1. Product Information and Installation Precautions • Duplex installation  If the flow rate is indicated on the flow calculation site, it is necessary to install a fan and air conditioner. Minimum Separation Distance  Minimum separation distance from wall 30mm or more (Aperture ratio 100%) Aperture ratio ...
  • Page 28 1. Product Information and Installation Precautions ◆ Ready to install • The preparations included in the Frame Kit are on the Frame kit installation page. • Supplied in the accessory kit. (CY-WJAPWP). ※ Recommended standard ※ When purchasing the product as an optional item, it must be purchased together. Electric driver ※...
  • Page 29 1. Product Information and Installation Precautions ◆ Cabinet accessory configuration Easy Setup Guide Leaflet – Regulatory Guide Leaflet - Warranty SCREW (M4*L10,2ea) Removed from W48, 2021 Removed AC Power Cable SPACER-EVA OCM Cable AC Power Cord (BN39-02752A) (BN39-02743A) (For Cover-Rear support during installation) (Depends on the country provided.) (Purchase of VG-WA10PKIT is needed.) (Purchase of VG-WR00PKIT is needed.)
  • Page 30 1. Product Information and Installation Precautions □ Special Features of IWA / IFA Screen Configuration (Compared to former models) ▶ Basic connection Type : Upper / Lower docking for vertical, OCM Cable for Horizontal ※ Video signal and AC Power ※...
  • Page 31 1. Product Information and Installation Precautions □ Docking Connection in detail - Cabinet to Cabinet : Upper / Lower Docking Connection ※ Signal and AC Power Connection 1. Cabinet Connected with Docking 2. Inner Docking ASSY 3. OCM Connector and AC Connector ②...
  • Page 32 1. Product Information and Installation Precautions □ Guide for docking connection error (Mechanical) ▶ Check Cabinet status. - Additional insertion is carried out by applying a load on the bracket-frame to prevent cabinet not inserted. BRACKET-FRAME LED Module ※ When applying the load, apply the load only to BRACKET-FRAME so that there is no damage to the LED module. ▶...
  • Page 33 1. Product Information and Installation Precautions □ Guide for docking connection error (Circuit) ▶ Check AC power supply - Check the AC switch on the right side (in the top direction) → The switch disconnects the AC supply at the bottom and must be supplied from the following cabinet. ※...
  • Page 34 1. Product Information and Installation Precautions □ Cable Connection Features by location ① S-Box → I/G Board → First Cabinet ※ Cable Connections (ex. 4 X 4) Media Source S-Box Interface Gender (PC… etc) (I/G) ③ Last Cabinet → I/G Board → S-Box ②...
  • Page 35 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet + Frame Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-Box Installation and Connection 9. Connections – Power and Signal 10.
  • Page 36: Preparation For Cabinet Installation

    2. Preparation for Cabinet Installation ◆ Preparations before installation ① Remove the Box tape at the upper area and then open up the box. (Fig.2) ② Remove the Top-cushion and bag shielding. Grab the handle inside, take out the cabinet and open Al-Bag. Then remove the filament-tape and PAD-EPE.
  • Page 37 2. Preparation for Cabinet Installation ◆ Preparations before installation ④ Check whether there is any abnormality on the screen by connecting the power cable. (Fig.4) ※ Before checking the screen, remove the PAD-SHEET and attach the SPACER-EVA. ⑤ Remove 4 screws to disassemble cover-corners. (Fig.5) SCREW POINT ※...
  • Page 38 2. Preparation for Cabinet Installation ◆ Preparations before installation DOCKING (TOP) DOCKING (TOP w/ Cover) AC Power Input SWICH ※ Cover to prevent exposure of the power supply / Proceed to delete before assembly DOCKING (BOTTOM) DOCKING (BOTTOM w/ Cover) ※...
  • Page 39 2. Preparation for Cabinet Installation ◆ Preparations before installation ◇ Connect the power cable to the SET and check whether the LED is damaged and the screen display. ① After AC power is applied, press the switch on ④ 3 sec the rear side for 1 second to release the power Dehumidifying NO VIDEO...
  • Page 40 2. Preparation for Cabinet Installation ◆ Preparations before installation ⑥ After removing the cover corner, remove the 4 screws as shown in the figure. (Fig.6) ※ Caution : Please, Don’t forget front service can be IMPOSSIBLE, if the screw is not removed. ⑦...
  • Page 41 2. Preparation for Cabinet Installation ◆ Preparations before installation * As there is a risk of electric shock, be sure ⑧ Removal of Upper Docking Dust Cap to perform the work below with AC power removed. REAR FRONT ⒧ Using the 1.5mm wrench in the Frame Kit component (Item 15 in ⑵...
  • Page 42 2. Preparation for Cabinet Installation ◆ Preparations before installation ⑩ The Cabinets installed on the top line works as follows. 1) Take out the Cabinet and lay it down on the Cushion-BOT. (Take out the cushion from the box as well.) 2) Detach the Module frame and main frame.
  • Page 43 2. Preparation for Cabinet Installation ◆ Preparations before installation (Refer to if necessary to disassemble the module) ※ Module frame assembly / disassembly in detail 1) Disassembly Lay down the Cabinet Detach the Frame. (It is easier to separate them one by one than to separate them into a bucket) on the cushion.
  • Page 44 CASE 1. Module warpage solution (Concave shape) ◆ Refer to when the screen is directly exposed to the light source or when module shaping concave) Light ※ Reworking instruction 1) Disassemble the module. ①Lay down the Cabinet ②Remove 4 screws. ③Detach the Frame.
  • Page 45 CASE 1. Module warpage solution (Concave shape) ◆ Refer to when the screen is directly exposed to the light source or when module shaping concave) ※ Reworking instruction 2) Rotate screws like below in the ASSY Module to counterclockwise. * Proceed by referring to the production date of the label attached to BOX. As of November 2021, The production before November is applied to Case...
  • Page 46 CASE 1-1. Module warpage solution (Concave shape) ◆ Refer to when the screen is directly exposed to the light source or when module shaping concave) ※ Reworking instruction 2) Rotate screws like below in the ASSY Module to counterclockwise. Screw Mark different colors pen on the opposite side : counterclockwise of the driver tip.
  • Page 47 CASE 1-2. Module warpage solution (Concave shape) ◆ Refer to when the screen is directly exposed to the light source or when module shaping concave) ※ Reworking instruction 2) Rotate screws like below in the ASSY Module to counterclockwise. Screw Mark different colors pen on the opposite side : counterclockwise of the driver tip.
  • Page 48 CASE 2. Z-axis adjustment method ※ Adjustment method for z-axis difference between modules Z-axis difference ※ When Bracket pin is fixed because it is fully-rotated to counterclockwise. 1) First adjustment (if the bracket pin is fully assembled) : Rotate the bracket pin of the module has lower Z axis level to clockwise. ※...
  • Page 49 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet + Frame Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-Box Installation and Connection 9. Connections – Power and Signal 10.
  • Page 50: Frame Kit Components

    3. Frame kit Components □ Installation order : FRAME → CABINET Adjustment of flatness between walls using Spacer-ETC Frame Left Frame Right Assy frame H Frame Left Laser Level Assy frame V Frame Right ③ Adjust horizontals, verticals and fix the screw ①...
  • Page 51 3. Frame kit Components Material Components Type Division Configuration Model Code ASSY FRAME- ASSY FRAME- ASSY HOLDER- ASSY FRAME- ASSY FRAME- HORIZONTAL HORIZONTAL MAGNET Acc. box Level VERTICAL VERTICAL IG SINGLE DOUBLE HORIZONTAL (1 Wide) (2 Wide) VG-LFA33SWW 1(3 High) Fixed Full kit VG-LFA44SWW...
  • Page 52 3. Frame kit Components Frame Kit Components VG-LFA33SWW VG-LFA44SWW VG-LFA55SWW Item ( 3 X 3 ) ( 4 X 4 ) ( 5 X 5 ) ASSY FRAME-HORIZONTAL DOUBLE ASSY FRAME-HORIZONTAL SINGLE ASSY FRAME-VERTICAL ASSY FRAME-VERTICAL IG ASSY HOLDER-MAGNET HORIZONTAL SCREW-MACHINE (FH, M4, L6) SCREW-MACHINE (FH, M4, L8) SCREW-MACHINE (FH, M4, L10)
  • Page 53 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet + Frame Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-Box Installation and Connection 9. Connections – Power and Signal 10.
  • Page 54: Frame Installation

    4. Frame installation ※ Precautions for Fastening the Screws LED R&D Lab(VD)
  • Page 55 4. Frame installation ① ASSY FRAME VERTICAL (Same as 3X3/4X4/5X5) 1 Separate SET into FRAME VERTICAL L/R and HOLDER-MAGNET VERTICAL(* Note that it is not ASSY FRAME VERTICAL IG) (Fig.1) After separating 10 connected screws, use it as a frame vertical L/R(Fig.2) The remaining HOLDER-MAGNET VERTICAL is used when installing the extension.(Fig.3)
  • Page 56 4. Frame installation ② ASSY FRAME H DOUBLE and SINGLE (different according to the 3X3/4X4/5X5 specification) are extended by using the connected JOINT H Connect two FRAME H without screw, Pay attention to the guide engraving position. (Fig.1) * The screw fastening is carried out in the next step. Extended by combining FRAME H according to the installation specifications, and the last JOINT H is used only for extended installation (Fig.2) Note the guide position Fig.1 ASSY FRAME H extension...
  • Page 57 4. Frame installation ③ Assemble ASSY FRAME VERTICAL and ASSY FRAME H ※ Work on a flat floor. Position of ASSY FRAME VERTICAL IG for I/G BOX and BRIDGE BOX arrangement is autonomous (Fig.1) Assemble the STUD guide carefully according to the single/extended installation specification (Fig.2-1/Fig.2-2) M6,L12 SCREW - Fasten the SCREW (M6,L12) (Fig.
  • Page 58 4. Frame installation FRAME KIT ④ Install the assembled frame on the wall (Fig.1) ※ Before installation, it is necessary to move it upright to prevent bending during handling. (Lay down and don’t move) Fasten 1 place (A) in the upper center of the center, align the horizontal and vertical with a horizontal system, and then fasten the remaining 15 places.
  • Page 59 4. Frame installation ※ Refrence1. Frame extension in vertical direction FRAME H and FRAME V placed as extended installation specifications (Fig.1) Arrangement of spare JOINT H and HOLDER-MAGNET as extended installation specifications (Fig.2) - In the same way as a single installation, connect the frame V/H using M6, L12 SCREW, and connect the BRACKET-JOINT with M3, L8 SCREW between HOLDER-MAGNET VERTICAL.
  • Page 60 4. Frame installation ※ Reference2. (Optional) Frame extension in horizontal direction * Width adjustment is possible only for the part where two FRAME H are connected and installed. * Apply when it is difficult to adjust Z-SEAM due to reduced module movement during extended installation. - Disassemble the screws FH, M4, L6 in the adjustment area.
  • Page 61 4. Frame 설치 - Move and assemble two upper/lower STUDs assembled in the FRAME VERTICAL LEFT. (Fig.2) * As shown in the figure, make sure to move both the upper and lower STUDs. (Fig.3) * Adjust both FRAME VERTICAL LEFT and RIGHT can be adjusted up to 1.0mm. * If it is installed on the wall, adjust the amount of wall-mounted screw fastening so that the right FRAME KIT can be moved.
  • Page 62 4. Frame Installation ※ Additional correction of GAP between frame and wall (Reference) - After the frame and wall screws are fastened, use Spacer-ETC if gap correction is needed to improve flatness. * To check flatness, refer to the measurement method below. - Slightly loosen the screw on the part that needs correction.
  • Page 63 Contents 1. Product information and installation notes 2. Preparing for cabinet installation 3. Frame Kit composition 4. Frame installation 5. Cabinet + Frame installation 6. Frame Bezel composition 7. Frame Bezel installation 8. S-BOX installation and connection 9. Power and cable connection 10.
  • Page 64: Cabinet + Frame Installation

    5. Cabinet + Frame installation ※ CABINET installation structure ① The cabinet edge is closely attached to the frame according to the carved seal. (Fig.1) ② Assemble it so that it slides down by pressing the top of the frame. (Fig.2) Guide line Guide line...
  • Page 65 5. Cabinet + Frame installation ※ CABINET installation structure ③ If the CABINET does not fit with the seating line, adjust the Y-axis position using a screw. (Fig.1) Adjust by turning a ‘+’ driver. * Reference Installation Guide line Settled Guide line Settled Guide line Fig.1 Y-axis adjustment with screws LED R&D Lab(VD)
  • Page 66 5. Cabinet + Frame installation ※ Pre-work before cabinet installation - HDBase-T Cable, Bluetooth/Wi-Fi module, and 24pin system cable are connected to Bridge Box. - IR/ECO sensor module connects to IG Group 1. [S-Box] 24pin system Cable Bridge Box HDBaseT Cable Bluetooth/Wi-Fi Cable Bottom Sensor(Bluetooth/Wi-Fi) Sensor Top(IR/ECO Sensor)
  • Page 67 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ① (Intall the I/G at the bottom) Before installing CABINET, connect and arrange cables to I/G and BRIDGE BOX.(Fig.1) ※ CABINET No. 1 starts at the bottom left, and I/G is placed at the top right of CABINET No. 1 (attached by magnet). ※...
  • Page 68 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ① (Intall the I/G at the top) Be careful about the interference with CABINET COVER-POWER. ※ Position the SWITCH of the I / G toward the wall. (Fig.1) ※...
  • Page 69 5. Cabinet + Frame installation ※ S-BOX Connection IG / Bridge Box Specification (SNOWAAE, External IR/ECO & BT/WIFI ) - Cabling guide (BRIDGE-BOX-I/G, C-TYPE connection) 1. Connect C TYPE CABLE to BRIDGE BOX. 2. Fix C TYPE CABLE by attaching 1 HOLDER CABLE inside the yellow line (end). 3.
  • Page 70 5. Cabinet + Frame installation ※ S-BOX Connection IG / Bridge Box Specification (SNOWAAE, External IR/ECO & BT/WIFI ) - Cabling guide (I/G – S-BOX, OPTICAL CABLE connection) S-BOX(SNOWAAE) 1. Connect OPTICAL CABLE to I/G. 2. Arrange by attaching 1 HOLDER CABLE inside the yellow line (end). 3.
  • Page 71 5. Cabinet + Frame installation ※ S-BOX Connection IG / Bridge Box Specification (SNOWAAE, External IR/ECO & BT/WIFI ) - Cabling guide (BRIDGE-BOX – S-BOX, HDBT connection) S-BOX(SNOWAAE) 1. Insert HDBT cable into BRIDGE BOX. 2. VERTICAL FRAME Escape shape, turn the cable to the right. 3.
  • Page 72 5. Cabinet + Frame installation ※ S-BOX Connection IG / Bridge Box Specification (SNOWAAE, External IR/ECO & BT/WIFI ) - Cabling guide (BRIDGE-BOX – WIFI sensor, HDBT connection) 1. Connect WIFI CABLE to BRIDGE BOX. 2. Refer to the BRIDGE BOX attachment direction (so that the WIFI CABLE is arranged to the bottom) 3.
  • Page 73 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ※ Step 1 If the last CABINET is the even number, connect by installing I/G on the side frame of the last CABINET.(Fig.1). ※ If the last CABINET in the first stage is an odd number, I/G is installed on the side frame of the last CABINET in the top to connect.(Fig.2) ※...
  • Page 74 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] Bracket Support ② First-stage CABINETs assemble a separate bracket support at the bottom before installation. (Fig.1) - When after installing up to 1 levels, it fixes the CABINET position by adjusting the tanning bolts assembled on the bracket support.(Fig.2) ※...
  • Page 75 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ③ Before installing 1 CABINET, connect the I/G and DATA cables .(Fig.1) ※ Use the DATA cables enclosed in S-Box ※ Connect the connected I/G and BRIDGE BOX to the external S-BOX. DATA IN DATA OUT Fig.1 Connect 1st CABINET and I/G CABLE...
  • Page 76 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ④ After installing each of the first CABINETs, ​ ​ p roceed by connecting the power cable from the side . (Fig.1) ※ Connect the POWER CABLE by pressing it with your hand until you hear a “click” sound.(Fig.2) ※...
  • Page 77 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ⑤ Connect and install the power cable in the same way for the remaining 2,3,4,5,6 CABINETs in the 1st stage .(Fig.1) ※ In the first stage installation, the even numbered CABINET connects the next CABINET and DATA CABLE first and installs it.(Fig.2) (However, do not leave it on for more than 10 seconds before dehumidifying) ※...
  • Page 78 5. Cabinet + Frame installation ※ Large screen installation guide (8x8 or more) - Instead of horizontal installation, which is the conventional installation method, it proceeds with a step-by-step installation method. - After installing the first stage and leveling it, stack it up to the top based on the first cabinet. - If you need to adjust the z-axis step while installing the cabinet from the 2nd stage, remove the cabinet installed at the bottom of the next cabinet, adjust it, and then reinstall it.(Fig.1) * The reason for separating the cabinet is to facilitate movement between cabinets when adjusting the step difference.
  • Page 79 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ⑥ 2,3,4,5,6 While installing the CABINET, check if there is a step in the Z axis. ※ When a step occurs, use an absorber to open the gap between the CABINETs with the step difference. (Fig.1) ※...
  • Page 80 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ⑦ After the first stage installation is finished, from the second stage, install the upper and lower Protective Sheet docks without cables in the same direction. Be sure to remove the attached protective sheet before installing the common surface.
  • Page 81 Temporary Solution for using adsorber 1. Attach OPP TAPE to the module to which the adsorber is to be attached. 2. Place the adsorber on the OPP TAPE in UNLOCK state. 3. Press the adsorber and adsorb it. (LOCK status) Un-Lock Lock OPP TAPE...
  • Page 82 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) A/S-ASSY GAP TOOL (BN81-17113A) [ UHD SCREEN (36Cabinet) ] ⑧ When installing docking, check the Z-axis step between upper and lower CABINETs. ※ If a step occurs, use an absorber to open the gap and then fix the gap using a Gap Tool (Fig. 1). ※...
  • Page 83 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ⑨ When installing the top CABINET, the odd numbered CABINET connects the DATA CABLE between the next CABINET. ※ It is the same as the cable connection method when installing the first stage (Fig. 1). ※...
  • Page 84 5. Cabinet + Frame installation ◇ CABINET installation (IWA P1.26) [ UHD SCREEN (36Cabinet) ] ⑩ After installing the CABINET, fix the X-axis position by fastening the screw on the side and the Z-axis position using a magnet. 20x20 magnet ※...
  • Page 85 5. Cabinet + Frame installation ◇ Screen inspection when installing CABINET (Service JIG / IWA, IFA common) [Screen inspection using upper docking and service jig when installing cabinet] ※ Insert the service jig into the docking signal connector on the top of the cabinet as shown below. ※...
  • Page 86 Contents 1. Product information and installation notes 2. Preparing for cabinet installation 3. Frame Kit composition 4. Frame installation 5. Cabinet + Frame installation 6. Frame Bezel composition 7. Frame Bezel installation 8. S-BOX installation and connection 9. Power and cable connection 10.
  • Page 87 6. FRAME BEZEL configuration Material Composition Type Division Configuration Model Code ASSY FRAME ASSY FRAME ASSY FRAME ASSY FRAME ASSY FRAME ASSY FRAME ASSY FRAME ASSY FRAME ASSY BEZEL TOP BEZEL TOP BEZEL BEZEL BEZEL SIDE BEZEL SIDE BEZEL SIDE BEZEL SIDE ACCESSORY MANUAL...
  • Page 88 6. FRAME BEZEL configuration VG-LFA11SDW 1X1 VG-LFA33SDW 3X3 VG-LFA44SDW 4X4 VG-LFA55SDW 5X5 Part Name Q'ty Part Name Q'ty Part Name Q'ty Part Name Q'ty ASSY FRAME-BEZEL TOP (1) ASSY FRAME-BEZEL TOP (2) ASSY FRAME-BEZEL TOP (2) ASSY FRAME-BEZEL TOP (2) ASSY FRAME-BEZEL BOTTOM (1) ASSY FRAME-BEZEL BOTTOM (2) ASSY FRAME-BEZEL BOTTOM (2)
  • Page 89 Contents 1. Product information and installation notes 2. Preparing for cabinet installation 3. Frame Kit composition 4. Frame installation 5. Cabinet + Frame installation 6. Frame Bezel composition 7. Frame Bezel installation 8. S-BOX installation and connection 9. Power and cable connection 10.
  • Page 90: Frame Bezel Installation

    7. Frame Bezel installation ◇ After confirming the IWA/IFA model specification, BEZEL additional ASSY operation MAGNET is floating Attached with BEZEL 1. Check the IWA/IFA model specifications. direction Attach in the direction Add MAGNET SHEET specification for IWA model only. *...
  • Page 91 7. Frame Bezel installation ◇ Bezel installation 1. Before installing the Frame Bezel Top/Bottom, Remove the Cover Cap and attach the sensor according to the sensor position. * The sensor is included in the S-BOX component accessory as shown in the picture. * Based on 4x4, 1 Sensor Bottom and 1 Bluetooth/Wi-Fi will be added.
  • Page 92 7. Frame Bezel installation ◇ Bezel installation * Based on 4x4, there are 2 Cover-Caps per cabinet, so attach the sensor by removing only the Cover-Cap as shown. (Installed when reclaimed, but not used) ※ Select the sensor closest to the hole in the bezel and use it. SENSOR BOTTOM SENSOR BOTTOM (IR/Light sensor)
  • Page 93 7. Frame Bezel installation ◇ Bezel installation 2. Sensor Bottom and Bluetooth/WiFi are divided into IG #1 / #2 and installed in advance. (Bezel installation) ① I/G 1 is installed from the bottom of the first screen on the left → Bridge Box connection (WiFi / BT) ②...
  • Page 94 7. Frame Bezel installation ◇ Bezel installation 3. BRIDGE BOX is connected to I/G at the top while connected to Bluetooth/Wi-Fi. * BRIDGE BOX is attached to the rear part of the vertical sharing surface of the frame kit. Bottom Sensor (Bluetooth/Wi-Fi) LED R&D Lab(VD)
  • Page 95 7. Frame Bezel installation ◇ Bezel installation 4. If FRAME BEZEL BOTTOM, remove the cover cap at both ends and attach the SENSOR BOTTOM to the possible outside. * When attaching a sensor, assemble it by pressing the hook part. (When assembling, it must be clicked.
  • Page 96 7. Frame Bezel installation ◇ Bezel installation 5. In the case of Bluetooth/Wi-Fi sensor module, when installing FRAME BEZEL BOTTOM, it is attached after removing Cover-Cap * When attaching a sensor, assemble it by pressing the hook part. * The Bluetooth/Wi-Fi sensor is installed at the bottom of the 1st cabinet. (When assembling, it must be clicked.
  • Page 97 7. Frame Bezel installation ◇ Bezel installation 6. Connect BRACKET LINK to the FRAME BEZEL TOP BOTTOM with M3 SCREW. M3,L5 BRACKET LINK LED R&D Lab(VD)
  • Page 98 7. Frame Bezel installation ◇ Bezel installation ※ BEZEL Installation Order BOTTOM → SIDE → TOP 7. FRAME BEZEL BOTTOM INSTALLATION * Assemble the FRAME BEZEL BOTTOM between the bending parts of the Bracket Support on the lower side of the cabinet. DOCKING (BOTTOM / COVER) DOCKING (TOP / COVER ) ※...
  • Page 99 7. Frame Bezel installation ◇ Bezel installation 8. Position the ASSY FRAME BEZEL TOP BOTTOM at the top left of the cabinet. * Using one M4, L8 screw, connect the frame bezel top bottom and the top hole of the cabinet (2 places).
  • Page 100 7. Frame Bezel installation ◇ Bezel installation 9. Position the ASSY FRAME BEZEL TOP BOTTOM on the upper right of the cabinet. * Using one M4, L8 screw, connect the frame bezel top bottom and the top hole of the cabinet (2 places).
  • Page 101 7. Frame Bezel installation ◇ Bezel installation 10. Using two M3, L5 screws each, fasten it to the frame bezel top boot. (Fig. 1) * When a gap occurs in the middle of the bezel, attach a sheet bezel so that the gap is not visible from the front.
  • Page 102 7. Frame Bezel installation ◇ Bezel installation 12. Install the bezel at the bottom of the cabinet in the same way as in steps 8-12. * Be careful not to create a gap between the frame bezel side and frame bezel top boot. M3,L5 M4,L8 M4,L8...
  • Page 103 7. Frame Bezel 설치 ◇ Bezel installation ※ BEZEL Installation Order BOTTOM → SIDE → TOP 13. FRAME BEZEL SIDE INSTALLATION * Insert the FRAME BEZEL SIDE on the left/right side of the cabinet and attach it to the front. (Fig.1) * Add MAGNET SHEET specification for IWA model only.
  • Page 104 7. Frame Bezel installation ◇ Bezel installation 14. FRAME BEZEL SIDE INSTALLATION * After attaching the BEZEL SIDE, assemble the assembled BEZEL BOTTOM with the screw. (Fig.1) M3,L5 Fig.1 BEZEL SIDE and BEZEL BOTTOM screw assembly LED R&D Lab(VD)
  • Page 105 7. Frame Bezel installation ◇ Bezel Extension installation • Vertical Extension - If it is a cabinet of 5 or more stages, the FRAME BEZEL SIDE is extended through the connection of the BRACKET with the M3,L3 screws. M3,L3 LED R&D Lab(VD)
  • Page 106 7. Frame Bezel installation ◇ Bezel Extension Installation • Vertical extension (in case of 8X8 extension) 1. Attach EXTENDED SHEET to FRAME BEZEL TOP ① TOP Attached to the inner upper part guide (red dotted line) ② After attaching from the end to the end of the TOP, cut the remaining part for use. *EXTENDED SHEET 사양...
  • Page 107 7. Frame Bezel installation ◇ Bezel Installation ※ BEZEL Installation Order BOTTOM → SIDE → 15. FRAME BEZEL TOP INSTALLATION * Assemble the FRAME BEZEL TOP between the bending parts of the Bracket Support on the upper side of the cabinet. LED R&D Lab(VD)
  • Page 108 7. Frame Bezel installation ◇ Bezel Installation 16. Place the ASSY FRAME BEZEL TOP on the upper left of the cabinet. * Using one M4, L8 screw, fasten the FRAME BEZEL TOP and the top hole of the cabinet (2 places) * If gap correction is necessary, add a gap sheet to adjust the separation distance.
  • Page 109 7. Frame Bezel installation ◇ Bezel Installation 17. Place the ASSY FRAME BEZEL TOP on the upper right of the cabinet. * Using one M4, L8 screw, fasten the FRAME BEZEL TOP and the top hole of the cabinet (2 places) * If gap correction is necessary, add a gap sheet to adjust the separation distance.
  • Page 110 7. Frame Bezel installation ◇ Bezel Installation 18. Fasten to FRAME BEZEL TOP using two M3 and L5 screws each. (Fig.1) * When a gap occurs in the middle of the bezel, attach a sheet bezel to prevent the gap from being seen from the front. (According to the degree of separation, the number of SHEET BEZELs is added consecutively and supplemented.) 19.
  • Page 111 7. Frame Bezel installation ◇ Bezel Installation 20. Assembly with FRAME BEZEL SIDE * After attaching the bezel top, assemble the assembled bezel side and screws. (Fig.1) M3,L5 Fig.1 BEZEL TOP and BEZEL SIDE screw assembly LED R&D Lab(VD)
  • Page 112 7. Frame Bezel installation ◇ Bezel Extension Installation • horizontal extension - The extension of the FRAME BEZEL TOP BOTTOM in the horizontal direction is the same as the basic installation method. - When it comes to the screen of the six-row cabinet, three FRAME BEZEL TOP BOTTOMs (2) are connected and installed.
  • Page 113 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet + Frame Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-Box Installation and Connection 9. Connections – Power and Signal 10.
  • Page 114: S-Box Installation And Connection

    8. S-Box Installation and Connection • S-BOX Connection (SNOWAAE) ※ Names of parts from Front / Rear side of the SET - Please refer to the image below for the names of each part on the front and back of the set. - Front side Info LCD Jog Key...
  • Page 115 8. S-Box Installation and Connection • SNOWAAE S-BOX Connection ① Input video signal to S-BOX. (Input port : HDMI, DP) ② Check the input signal through SOURCE STATUS.(RED : HDMI1 , GREEN : HDMI2, Blue : DISPLAY PORT) ③ AAE Box supports 8K(7680 x 4320 @60Hz) input resolutions. ※...
  • Page 116 8. S-Box Installation and Connection • S-BOX IG and Bridge Connection Specification (SNOWAAE, External IR/ECO & BT/WIFI ) - HDBase-T Cable, Bluetooth/Wi-Fi module, and 24pin system cable are connected to Bridge Box. - IR/ECO sensor module connects to IG. 24pin system Cable [S-Box] Bridge Box HDBaseT Cable...
  • Page 117 8. S-Box Installation and Connection □ IG Settings by screen configuration ( SNOW-AAE Only - Manual IG Switch settings decide Vx1 / STB Power / UART specification by screen type - Settings by screen type ※ Default : Cable-less Primary IG NO.
  • Page 118 8. S-Box Installation and Connection • Optical Cable Connection ① Optical Cable Connection Connect optical cable from One connect terminal of AAE S-Box to Module Rx of I/G Board. ※When the optical modules Tx and Rx are connected, they must be connected by an optical cable without FDF connection or optical fusion.
  • Page 119 8. S-Box Installation and Connection ② Instruction for handling Optical Cable  Use BIMMF, OM3, LC-LC connector type optical cable for stability of operating. * BIMMF (Bend Insensitive Multimode Fiber) ★ Unusable : Single Mode, OM1, OM2 type  Do not contact with device sharp and rough. ...
  • Page 120 8. S-Box Installation and Connection ③ Cable Connection  Since it is a common cause of malfunction, special attention is required when connecting the connector.  In the case of duplex type, the locking structure is released and connected one by one like Simplex. S-Box (SNOW-AAE) Cabinet Duplex...
  • Page 121 8. S-Box Installation and Connection ③ Cable Connection  Remove the dust protection cap and connect the cable as below picture.  Insert with weak force until it sounds “Click”.  Keep the dust protection cap well for reuse. Insert a protection cap on an unused port to protect from dust.
  • Page 122 8. S-Box Installation and Connection ③ Cable Connection  Check it whether the cable is inserted well.  Install the optical cable carefully. The optical cable does not have the tension of the upper/lower and the left/right. LED R&D Lab(VD)
  • Page 123 8. S-Box Installation and Connection ③ Cable Connection  When you remove the cable, press the detach clip to remove it. Do not just pull the cable as below.  Do not force the optical cable by pulling it up and down. LED R&D Lab(VD)
  • Page 124 8. S-Box Installation and Connection ④ Instruction for handling Optical Cable  Consider the pulling force so that the minimum force is applied to the optical fiber when installing the cable. (Refer to each cable specification.)  Optical loss occurs, If the optical cable is bent above the allowed bending radius. Install cable below allowed bending radius.
  • Page 125 8. S-Box Installation and Connection ④ Instruction for handling Optical Cable  Gently fix the optical cable to prevent direct compression when fixing it to Tray and so on. Tighten the clamp Clamp tightening properly Fixed soft material Fixing the excess clamp of cable ...
  • Page 126 8. S-Box Installation and Connection  24V Adaptor Connection ① Adadptor Connection  Connect the enveloped 24V adaptor to rear power connector.  Power on using Power button from Remote controller enveloped or push button at the front. [Caution] ※ When powering on/off for the TEST, give enough time (more than 5mins) to be stable. LED R&D Lab(VD)
  • Page 127 • S-Box Connection (Panel Configuration) ① S-Box Default Picture Setting • The default picture configurations are optimized for LH015IFH in Samsung factory. • The picture configurations will be configured automatically when you finish the installation. • For the best picture quality, Please connect S-Box and LED displays via LSM software properly.
  • Page 128 8. S-Box Installation and Connection • S-Box Connection (Panel Configuration) ② S-Box Connection (Grouping)  Home → Video Wall : OFF → On [Caution] Before executing S-Box Grouping in LSM (LED Signage Manager), be sure to set the resolution of the input source device to the resolution supported by S-Box Grouping.
  • Page 129 8. S-Box Installation and Connection • S-Box Connection (Panel Configuration) ③ Setup the resolution of input PC • PC: Click the right button of mouse → Click Screen resolution → Click Advanced settings • Click “Monitor” tap → Monitor Settings → Setup “Screen refresh rate” to 60Hz LED R&D Lab(VD)
  • Page 130 8. S-Box Installation and Connection ④ S-Box Grouping Support Frequency (1/2) LED R&D Lab(VD)
  • Page 131 8. S-Box Installation and Connection ④ S-Box Grouping Support Frequency (2/2) LED R&D Lab(VD)
  • Page 132 8. S-Box Installation and Connection • S-Box Connection (Panel configuration) ⑤ Picture Menu Settings • In order to use S-Box grouping, both Dynamic Contrast and Black Tone functions should be turned off to reduce the image quality deviation between S-Boxes. •...
  • Page 133 8. S-Box Installation and Connection ④ S-box Grouping Support Frequency (2/2) Service Port is a terminal dedicated to monitoring to check the operation status of the source being played and using the OSD ① during the initial installation of the S-Box. The resolution of the corresponding PORT is FHD (1920*1080 @ 60Hz).
  • Page 134 8. S-Box Installation and Connection • Simple wall mode Operation ※ Only for JMU/JAU/RAF models  This is a function that allows users to simply display a wallpaper and use it when the user does not want to display a black screen while not using the product. ...
  • Page 135 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet + Frame Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-Box Installation and Connection 9. Connections – Power and Signal 10.
  • Page 136: Connections - Power And Signal

    Must CONNECT the devices less than the recommended maximum number of devices. ※ Samsung Electronics is not responsible for AC power connecting exceed recommended maximum number of devices. • The label info which is attached behind product shows rated power of cabinet and rated current of outlet.
  • Page 137 9. Connections – Power and Signal  Multi S-BOX Connection (S-BOX Redundancy) - Picture Menu Settings • Picture mode should be set as ‘Calibration’ to use Multi S-Box. • Menu→ Picture → Picture Mode : Calibration • Video Wall Mode should be set ‘ON’. •...
  • Page 138 9. Connections – Power and Signal 9-2. S-Box Connection and IG Settings by Screen Type  Cable-less 4K Screen S-Box Redundancy IG DIP Settings Box -Redundant IG #1 -Redundant Video • Video: VBY1 IG #2 -Redundant Video • Control: Ethernet, I2C, UART Video •...
  • Page 139 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  Max 4K Pillar Screen S-BOX Redundancy IG DIP Settings IG #2 -Redundant SBOX Connection Setting Sequence 1. Connect Box- Redundant first to IG-Primary and set LSM. → Cabinet information goes to Box-Redundant when setting LSM. Box -Redundant Box -Primary IG #1 -Primary...
  • Page 140 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  Max 4K Pillar Screen S-BOX Redundancy IG DIP Settings IG #2 -Redundant SBOX Connection Setting Sequence Connect Box- Primary and IG-Primary and set New Connection at LSM. → Cabinet information goes to Box-Primary when setting LSM. Box -Redundant Box -Primary IG #1 -Primary...
  • Page 141 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  Max 4K Pillar Screen S-BOX Redundancy IG DIP Settings IG #2 -Redundant SBOX Connection Setting Sequence Connect Box- Redundant and IG-Redundant. Box -Redundant Box -Primary IG #1 -Primary Video+Control Video+Control IG #2 -Primary LED R&D Lab(VD)
  • Page 142 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  4K Max Pillar Screen S-BOX Redundancy IG DIP Settings Choose S-Box LSM 설정 Set different IP to Box-Primary and Box-Redundant each. Ex) Box-Primary : 192.168.1.50 Box-Redundant : 192.168.1.60 Group 2 SBOX at LSM. SBOX Control should be done in Group window.
  • Page 143 9. Connections – Power and Signal 9-2. S-Box Connection and IG Settings by Screen Type  Cable-less Screen (4K Max) + Data Redundancy DIP Settings IG #2 -Redundant Video IG #1 -Redundant • Video: VBY1 • Control: Ethernet, I2C, UART Video Box -Single IG #1 -Primary...
  • Page 144 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  Normal OCM Cable Connection Screen + S-BOX Redundancy IG DIP Settings OC Cable • Video: VBY1 • Control: Ethernet, I2C, UART • Picture Mode while using Multi Box : Calibration Menu →...
  • Page 145 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  Normal OCM Cable Connection Screen + Redundancy IG DIP Settings OCM Cable IWA/IFA/IEA IWA/IFA/IEA IER/IFR IER/IFR IG #1 –Forward/Backward Video+Control Video Only LED R&D Lab(VD)
  • Page 146 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  Cable Only Connection Case ( + S-BOX Redundancy IG DIP Settings single level installation ※ ex) The lowest 4X1 area from IWA P0.84 5X5 Screen • Video: VBY1 • Control: Ethernet, I2C, UART •...
  • Page 147 9. Connections – Power and Signal  S-BOX Connection (Redundancy)  Cable Only Connection Case ( + Redundancy IG DIP Settings single level installation ※ ex) The lowest 4X1 area from IWA P0.84 5X5 Screen OC Cable OC Cable OC Cable IWA/IFA/IEA IWA/IFA/IEA IWA/IFA/IEA...
  • Page 148 9. Connections – Power and Signal 9-3. How to set by installation type. (IWA + SBB-SNOWAAE) ▶ Z-Order ※ The Z-Order installation method supports both SBB-SNOWAE / SBB-MBOXACE. LED R&D Lab(VD)
  • Page 149 9. Connections – Power and Signal 9-3. How to set by installation type. (IWA + SBB-SNOWAAE) ▶ N-Order ※The N-Order installation method only supports the SBB- SNOWAAE model. For the SBB-MBOXACE model, only the Z-Order method is supported. LED R&D Lab(VD)
  • Page 150 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 4 x 4 = 16 Installation Type Cable-less Backward Redundancy IG add-on S-Box add-on Q’ty...
  • Page 151 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 IG ® IG ® Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 4 x 4 = 16 Installation Type Cable-less Backward Redundancy IG add-on...
  • Page 152 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.26 Model Resolutions 640 x 360 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 6 x 6 = 36 Installation Type Cable-less Backward Redundancy IG add-on S-Box add-on Q’ty...
  • Page 153 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.26 Model Resolutions 640 x 360 IG ® IG ® IG ® IG ® Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 6 x 6 = 36 Installation Type Cable-less Backward...
  • Page 154 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.68 Model Resolutions 480 x 270 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 8 x 8 = 64 Installation Type Cable-less Backward Redundancy IG add-on S-Box add-on Q’ty...
  • Page 155 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.68 Model IG ® IG ® IG ® IG ® Resolutions 480 x 270 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 8 x 8 = 64 Installation Type Cable-less Backward...
  • Page 156 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 4 x 4 = 16 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty...
  • Page 157 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 4 x 4 = 16 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty...
  • Page 158 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size 4K UHD IG ® Screen Resolutions 3840 x 2160 Cabinet 4 x 4 = 16 Installation Type Cable Backward Redundancy IG add-on S-Box add-on...
  • Page 159 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.26 Model Resolutions 640 x 360 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 6 x 6 = 36 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty...
  • Page 160 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.26 Model Resolutions 640 x 360 IG ® IG ® Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 6 x 6 = 36 Installation Type Cable Backward Redundancy IG add-on...
  • Page 161 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.68 Model Resolutions 480 x 270 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 8 x 8 = 64 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty...
  • Page 162 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.68 Model Resolutions 480 x 270 IG ® Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 8 x 8 = 64 Installation Type Cable Backward Redundancy IG add-on S-Box add-on...
  • Page 163: Installation Type Cable Ig

    9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size Screen Resolutions 5760 x 3240 Cabinet 6 x 6 = 36 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 164: Backward

    9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size Screen Resolutions 5760 x 3240 Cabinet 6 x 6 = 36 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 165 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.26 Model Resolutions 640 x 360 Size Screen Resolutions 5760 x 3240 Cabinet 6 x 6 = 36 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 166: F B F B

    9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size Screen Resolutions 7680 x 4320 Cabinet 8 x 8 = 64 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 167 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P0.84 Model Resolutions 960 x 540 Size Screen Resolutions 7680 x 4320 Cabinet 8 x 8 = 64 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 168: Redundancy Ig Add-On

    9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.26 Model Resolutions 640 x 360 Size Screen Resolutions 7680 x 4320 Cabinet 12 x 12 = 144 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 169: Q'ty S-Box

    9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.68 Model Resolutions 480 x 270 Size Screen Resolutions 7680 x 4320 Cabinet 16 x 16 = 256 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 170: F B F B F B Fb

    9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IWA) Pitch P1.68 IG ® IG ® IG ® IG ® Model Resolutions 480 x 270 Size Screen Resolutions 7680 x 4320 Cabinet 16 x 16 = 256 Installation Type Cable Backward Redundancy...
  • Page 171 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IFA) Pitch P2.1 Model Resolutions 384 x 216 Size Screen Resolutions 1920 x 1080 Cabinet 5 x 5 = 10 Installation Type Cable power Backward Redundancy IG add-on S-Box add-on Q’ty S-Box...
  • Page 172 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IFA) Pitch P2.52 Model Resolutions 320 x 180 Size Screen Resolutions 1920 x 1080 Cabinet 6 x 6 = 12 Installation Type Cable Backward Redundancy IG add-on power S-Box add-on Q’ty S-Box...
  • Page 173 9. Connections – Power and Signal 9-3. Connect Configuration by Resolutions (IFA) Pitch P4.2 Model Resolutions 192 x 108 Size Screen Resolutions 1920 x 1080 Cabinet 10 x 10 = 100 Installation Type Cable power Backward Redundancy IG add-on S-Box add-on Q’ty S-Box...
  • Page 174 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet + Frame Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-Box Installation and Connection 9. Connections – Power and Signal 10.
  • Page 175: Settings / How To Use

    • Software to remotely control the layout of the LED cabinet • LSM program download location : Samsung Display Solutions (https://displaysolutions.samsung.com) Solutions > LED Signage Solution > LED Signage Manager ※ Partner login is required to download the program. LED R&D Lab(VD)
  • Page 176 10. Settings / How to Use 10-1. Control Program for PC 1. Connect the PC to the S-Box via Ethernet. 2. Use a LAN cable to connect the S-Box to the Interface Gender. 3. Use an OCM cable to connect the Interface Gender to the first LED cabinet. 4.
  • Page 177 10. Settings / How to Use 10-1. Control Program for PC When the LSM is launched for the first time, the password setting page appears. To set a password, enter the same password of your choice twice and click the Start button. If you do not want to use a password, select the “Don’t use password”...
  • Page 178 10. Settings / How to Use 10-1. Control Program for PC To add connection information, you can directly enter Search or IP address. If you click the Search button, the IP address of the S-BOX that can be connected on the same network is displayed.
  • Page 179 10. Settings / How to Use [★ Caution!] When configuring LED cabinet network settings, it is recommended that a static IP address be used. If DHCP is used and the IP address is changed, the connection with LSM may be disconnected. The 192.168.10.x band is used for internal communication with LED cabinets.
  • Page 180 10. Settings / How to Use 10-1. Control Program for PC [★ Caution!] For internal communication between the S-Box and LED cabinets, use ports 1515, 48484, 48485 and 58585 When firewalls / security network are in use, make sure the corresponding port between the S-Box and LED cabinets is enabled.
  • Page 181 10. Settings / How to Use 10-1. Control Program for PC Connection layout: Use the S-Box output source section to adjust the LED cabinet layout by rearranging cabinets. Feature View : Align, Layout preset, Export and Import for Cabinet Layout Device Information/Setting View: Shows LED cabinet information based on the following categories.
  • Page 182 10. Settings / How to Use 10-1. Control Program for PC Device Connection list Connected S-Boxes, Edit connection and Delete, Group information Connection layout (View Port) Cabinet’s layout Category View: Use the Home and Connections tabs to configure system settings. Device Information/Setting View: S-Box Settings, Cabinet Settings Sub Information View:...
  • Page 183 10. Settings / How to Use 10-1. Control Program for PC 1. Basic : . On/Off, Input source, Screen Mute / Freeze, Menu Size 2. Picture . Picture Mode, Brightness / Contrast / Sharpness, Color, Tint(G/R), Color Temp(K), Gamma, White Balance 3.
  • Page 184 10. Settings / How to Use 10-1. Control Program for PC 6. Cabinet Settings . Pixel RGB Data Reload / Request . OnScreen Display On / Off . LED Brightness . LED Frame Rate . Multiplier (Default, x2, x3, x4, x5) .
  • Page 185 10. Settings / How to Use 10-1. Control Program for PC • RGB CC control for Cabinet and Module • Edge Correction RGB CC control (Single / Multi) • Gradation control LED R&D Lab(VD)
  • Page 186 10. Settings / How to Use 10-1. Control Program for PC Monitor Window: Real-time communication records. You can check the MDC communication log during extraction by Export button LED Signage Cabinet: Basic information (ID, Resolution, Modules, Pitch, Temperature), IC and Power information, Software version LED Signage Box: Basic information (IP address, MAC address,...
  • Page 187 10. Settings / How to Use 10-1. Control Program for PC Options Command Retry Count Error Status Interval (Enable / Disable) Temperature Alert Support Language Advanced Log Management Mail alert Change Password About Software Check current version Update (for LSM) LED R&D Lab(VD)
  • Page 188 10. Settings / How to Use 10-1. Control Program for PC S-Box > Click Dehumidification icon Start Dehumidification mode (24 hours) Check progress You can Stop it by “Stop” button LED R&D Lab(VD)
  • Page 189 10. Settings / How to Use 10-1. Control Program for PC Test Patter of S-Box  When Test Pattern is turned ON, OFF or changed, the background screen may be displayed for a while due to Overlay layer switching. LED R&D Lab(VD)
  • Page 190 10. Settings / How to Use 10-1. Control Program for PC Keep LED cabinet’s Power to be not turned off for redundancy installation. Follow next steps to enable it. A. Close LSM and move to the LSM installation path B. Open LEDDisplayManagement_Config.xml file as Edit mode C.
  • Page 191 10. Settings / How to Use 10-2. Software Update – Cabinet ※ Files are different according to update method (LSM or USB) for AM3352 ※ Another tool is needed to update FPGA for USB using. L-IWAMWWAC-xxxx.x Code Release L-IFAMWWAC-xxxx.x Code Release 1.
  • Page 192 10. Settings / How to Use 10-2. Software Update – Cabinet 2. Click “Software Update” of Cabinet Settings L-IERMWWAC-1001.0 FPGAFW-2525218466 3. Click “Browse” button to select update file. Info.txt FPGAFW.bin L-IWAMWWAC-1001.0 Info.txt ※ Never choose “info.txt” file. It causes system failure. 4.
  • Page 193 10. Settings / How to Use 10-2. Software Update – Cabinet ※ AM3352 has different files to update to LSM/USB. ※ A separate tool is required to update the FPGA SW to USB. L-IWAMWWAC-xxxx.x Code Release Prepare the following items. L-IFAMWWAC-xxxx.x Code Release - USB memory formatted in FAT32 format - Copy the update file to the USB root folder...
  • Page 194 10. Settings / How to Use 10-2. Software Update – S-Box 1. Prepare software file to be updated. (The file in the red box will be selected for software update.) 2. Click button in S-Box settings 3. Choose prepared file by clicking button.
  • Page 195 1) OSCAR-P Main Micom Software upgrade • USB Download Firmware upgrade downloaded from the "www.samsung.com" website 1. Connect the USB drive where the files are stored to the set. (Be careful not to disconnect the power or USB drive during the upgrade.) 2.
  • Page 196 10. Settings / How to Use 10-2. SW update – S-Box ② Update via USB 1) OSCAR-P Main Micom software upgrade Save the “SB-OSCPSBAWWC” folder to the USB root. Connect USB. Click the “MENU” key on the remote control. Select the “Customer Support” menu. Select the “Software Update”...
  • Page 197 10. Settings / How to Use 10-2. SW update – S-Box ② Update via USB 2) Sub Micom Upgrade (You can upgrade Sub Micom in Factory Mode. It takes about 1-2 minutes.) Save the “OSPMICOM_LXTV_SS.bin” file to the USB root. Connect USB.
  • Page 198 10. Settings / How to Use 10-2. SW update – S-Box ② Update via USB SE19HM02 (Novatek), KU060/K325T (FPGA) Software Upgrade ※ Screen blinking may occur during Firmware update Save the necessary files to each folder on the USB root. •...
  • Page 199 10. Settings / How to Use 10-2. SW update – S-Box ② Update via USB 4) Valens TX/RX upgrade (You can upgrade your Valens TX/RX in Factory Mode. It takes about 20 minutes.) Save the “TB-VSTXSHWWS.bin” and “TB-VSRXSHWWS.bin” files to the USB root. Connect USB.
  • Page 200 Thank you...
  • Page 201 S-Box Network IP Settings ■ S-Box Network IP setting using PC Using the file explorer, go to the folder where LSM is installed, Run [Start]-Programs-Samsung-LED Signage Manager-Network Configuration. Connect PC and S-Box with RS232C Cable, select the connected Serial Port, and click Open button to connect.
  • Page 202 Appendix 2 - S-Box Installation and Connection • Cautions when installing S-Box (SNOWJAU/SNOWAAE) ① It is recommended to install it in a 19inch Server rack. ② Install so that the vents are open and do not turn sideways or overturn. ③...
  • Page 203 Appendix 2 - S-Box Installation and Connection • SNOWJ*U S-Box Connection ① Input video signal to S-Box. (Input terminal: HDMI, DP) ② Check the input signal through a screen output device that can be connected to the DVI output port (HDMI1~4, DP).
  • Page 204 Appendix 2 - S-Box Installation and Connection ★ Orderly Rolled Random Rolled ★ • S-Box Connection (Recommend) (Not Recommend) ⑧ Instruction for handling HDBaseT (HDBT) cable  Use HDBase-T cables with 15 meter long at minimum and 100 meter long at maximum.
  • Page 205 Appendix 2 - S-Box Installation and Connection • S-Box Connection ⑨ Finishing method for HDBase-T Cable  STP RJ45 shielded Plug. RJ45 Connector should be CAT6 or CAT7 shielded RJ45 and load bar. Load bar  Inserting a conductor (conductor) into the plastic loader: Insert the conductor into the load bar of the RJ45 connector as shown below in the conductor structure (T-568B).
  • Page 206 Appendix 2 - S-Box Installation and Connection • S-Box Connection ⑨ Finishing method for HDBase-T Cable Push the plastic loader as close as possible: Push the plastic load bar as close as possible to the cable.  Cut all the wires leaving about 0.5” with a wire cutter. ...
  • Page 207 Appendix 2 - S-Box Installation and Connection • S-Box Connection ⑩ Finishing method for HDBase-T Cable • Drain wire is combined on the cable jacket as shown in the figure below using pliers. • Soldering the drain wire to the metal part of the RJ45 connector: After soldering the drain wire to the metal part of the RJ45 connector, cut off unnecessary parts.
  • Page 208 Appendix 2 - S-Box Installation and Connection • SNOW-J*U Connection (Data Redundancy) ① When redundancy specification is required Connect to the DATA OUT terminal of the last cabinet using OCM Cable from the DATA IN terminal of the Interface Gender. SNOW-J*U •...
  • Page 209 Appendix 2 - S-Box Installation and Connection • When using the Multi Link HDR function (Only for SBB-SNOWJMU) • Recommended to install in 19 inch Server rack ① The rubber stopper of the Multi Link HDR Port is open. ② Connect the connector of the Multi Link HDR Cable (sold Multi Link HDR Port separately) to the Multi Link HDR Port of each S-Box (※...
  • Page 210 Appendix 2 - S-Box Installation and Connection • Multi Link HDR Cable (No supports for models under SBB-SNOWJAU) • Use the correct cable according to the number of S-Box to be connected. (2, 3, 4 connecting cables. Check the number of connectors) Multi Link HDR Port LED R&D Lab(VD)
  • Page 211 Appendix 2 - S-Box Installation and Connection (No supports for model under SBB-SNOWJAU) • FPGA update guide when using Multi Link HDR Cable ※ Note: Update without connecting the Multi Link HDR Cable.  Factory update method  How to update LSM Multi Link HDR Port ①...
  • Page 212 Appendix 2 – Optical cable loss • Cable Loss according to Random mating Grade Random mating Cable loss Garde A 0.07 dB≤ Grade A ≤ 0.15 dB Garde B 0.12 dB≤ Grade B ≤ 0.25 dB Garde C 0.25 dB≤ Grade C ≤ 0.50 dB Garde D 0.50 dB≤...
  • Page 213 Appendix 3 - S-BOX Accessory List ◆ Accessories configuration (SNOW-JMU) LED R&D Lab(VD)
  • Page 214 Appendix 3 - S-BOX Accessory List ◆ Accessories configuration (SNOW-AAE) BN68-12473A BN68-01146G ※ 표 참고 4301-000103 BN59-01234A BN39-01545B BN44-00924A BN39-02776A BN96-49229A BN96-49132A BN59-01317A BN39-02473C BN61-16067A 6003-000133 6003-001150 【 Power cord by Region】 POWER CODE 3903-001117 3903-001118 BN63-18456A BN39-02466B BN96-54035A KOREA 3903-001074 CHINA 3903-001075...
  • Page 215 Appendix 4 – AAE S-BOX Specification ◆ SNOW-AAE Model Specification MODEL SBB-SNOWAAE PANEL Input HDMI1~4 In, DP In, RS232(for Service), 외장 IR/Eco, 외장 BT/WiFi, RJ45 LAN, USB, Power 24V Output DVI (for service), OC 8EA (to Cabinet), HDBT (for External BT/WiFi), SPDIF [Default] 3840*2160@60 Hz Input [Max] 7680 x 4320 @ 60 Hz (DP, HDMI 4), 3840 x 2160 @ 60 Hz (HDMI 1~3)
  • Page 216 Appendix 5 – AAE S-Box How to set Multiview function ◆About Multiview function • When the selection button is pressed on the remote control while the Multi View is active, you can set to change the source and screen size, delete the screen and exit to full screen. •...
  • Page 217 Appendix 5 – AAE S-Box How to set Multiview function ◆ 4 HDMI (Borderless) 설정 방법 ◆ 4 HDMI 설정 방법 ① Select ‘Multi View’ in Source menu ① Select ‘Multi View’ in Source menu ② Select ‘4 HDMI(Borderless)’ ② Select ‘4HDMI’ ③...
  • Page 218 Appendix 5 – AAE S-Box How to set Multiview function ◆ Layout Configuration ◆ Saving Layout Configuration • Content Selection Mode • Change source Other HDMI source can be selected. • Change screen size It is possible to save layouts. Screen size can be changed to large or small.
  • Page 219 Appendix 5 – AAE S-Box How to set Multiview function ◆ Supported resolution list LED R&D Lab(VD)

Table of Contents