ABB CP410M Installation And Operation Manual page 11

Table of Contents

Advertisement

2. Mount the operator terminal into the cut-out. Insert the fixtures to the
holes on the unit and fasten the screws into the front panel. Do not tighten
the screws with too much force or it may cause the deformation of the oper-
ator terminal.
Maximum torque:
Maximum torgue: 0.3 Nm
0.4~0.5 Nm (3.54~4.42 lb-in)
3. The operator terminal is to be installed within the angle of 0 to 135
shown below.
ABB, 1SBC159101M0202
Product Specifications
STEP 1
STEP 2
STEP 3
°
as
11

Advertisement

Table of Contents
loading

Table of Contents