Page 2
........24 Replacing Test Leads .......24 Replacing The Batteries...
Page 3
Conforms to UL STD. 61010-1, 61010-2-032, 61010-2-033; Certified to CSA STD C22.2 NO. 61010-1, 61010-2-032,61010-2-033 CAT III (MEASUREMENT CATEGORY III): It is applicable to test and measuring circuits connected to the distribution part of the building’s low-voltage MAINS installation.
Replacing Test Leads Replace test leads if leads become damaged or worn. WARNING Use meet EN 61010-031 standard, rated CA T III 600V, or better test leads. Replacing The Batteries WARNING To avoid electric shock, make sure that the test leads have been clearly move away from the circuit under measurement before opening the battery cover of the meter.
Need help?
Do you have a question about the MS2208 and is the answer not in the manual?
Questions and answers