Procedure with automated cleaning
The following operating state and the following prerequisites have been tested and ap-
proved by ABB Turbo Systems for cleaning operations:
Set the engine load as follows:
u
¡
Turbine mass flow M
¡
Turbine pressure ratio PIT ≈ 1.1
¡
Turbine inlet temperature between 380 ... 430 °C
Fig. 25: Cleaning cycle of turbine and nozzle ring with load ramp
As soon as the turbine inlet temperature is stable and less than 430 °C, wait for least 10
u
additional minutes for the turbine-end turbocharger components to cool down.
Start the cleaning cycle according to the following description Wet cleaning procedure.
u
Continuously increase the engine load during washing:
u
¡
Turbine mass flow M
¡
Turbine pressure ratio PIT = 1.6 ... 2.0
¡
Turbine inlet temperature <430 °C
© Copyright 2019 ABB. All rights reserved.
≈ 4.1 kg/s
Turb
≈ 6.5 kg/s
Turb