Operating Components - Silvercrest SEKU 2000 A1 Operating Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 62

Operating components

Operating components
NOTICE
The operating elements are on the front of the appliance, above right and behind the ventilation grille.
To operate them, fold the ventilation grille forward.
ON/OFF switch (Flames)
ON/OFF switch (Heating, level 1)
2
ON/OFF switch (Heating, level 2)
3
Temperature control (Thermostat)
4
Dimmer (for fl ame lamps)
5
SEKU 2000 A1
4
3
2
5
67
GB
MT

Advertisement

Table of Contents
loading

Table of Contents