Page 1
Installation Instructions Installation Instructions WAREMA pergola awning WAREMA pergola awning Perea P70 Perea P70 For qualified technicians only For qualified technicians only Valid from 14 January 2019 Valid from 14 January 2019 Document number 2023753 [Rev. 2 - en] Document number 2023753 [Rev. 2 - en]...
Table of contents Table of contents Safety and product information..................3 Installation......................... 4 Unpacking the product..........................5 Scope of delivery............................5 Product position............................6 Installing the consoles..........................7 Installing the bearing tube..........................8 Preparing the poles (optional)........................8 Erecting the portal............................8 Attaching the rafters.............................
Rain hood WAREMA. profile Intended use Fig. 1: Parts overview for Perea P70 The following details apply to the following product: Pergola Wind resistance awning P70 The product reaches the following wind resistance: class 3 The product is an external, weatherproof, large-area sun Use up to Beaufort 7 is permitted.
Safety and product information Rain class Installation The product provides rain protection starting at an INFO inclination angle of 7° (corresponds to the smallest possible The following installation steps are not described in angle that can be ordered). these installation instructions and can be found in the accompanying installation note.
Do not leave the packaging material lying around data. in disorderly fashion. If any items are damaged or not as specified in the order, stop installation and contact WAREMA. INFO Dispose of the packaging material properly after the unit is unpacked. Overview of ground connections...
Order depth = wall to back edge of post Installation height (bottom edge of console) 31* Distance from outer edge of side cover Fig. 2: Dimensional drawing of Perea P70 (all dimensions in mm) Page 6 | 22 2023753 [Rev. 2 - en]/2019-01-14...
Installation Fixation methods for the poles Installing the consoles INFO CAUTION Note the special features of the fixation methods Risk of injury from a falling product! of the components listed and have any necessary The number of consoles and the mounting preparations made.
Installation Installing the bearing tube Erecting the portal INFO Attaching the drainage gutter to the post Observe the tightening torque specifications (min. INFO tightening torque = 25 Nm/max. tightening torque The post is flush with the outer edge (higher side) of = 30 Nm). the drainage gutter. Mount the bearing tube Place the drainage gut- in the opening of the...
Installation Attaching the bearing part Move the rafter to posi- tion. Note the order data Attach the bearing parts (Fig. with screws DIN 912 M8x25 to the slot nuts in the drainage gutter. It should still be possi- ble to move the bearing parts.
DIN 912 M8x35. Fig. 5: Measuring the diagonals (Perea P70) Measure the diagonals D1 and D2 or D3 and D4 Installing the front trim panel (depending on the number of rafters). If D1/D3 = D2/D4, the rafters are parallel and at right angles.
Page 11
Installation Pencil in the fixing holes Hold the base plate centrally in the oblong against the screw foun- holes. This will make it dation. If the holes do possible to adjust the not align, the base plate position later on. must be turned.
Installation Retightening the inclination angle adjustment on the Tighten the fixing to the rafters point where it can still be adjusted later on. Lock the screws and tighten the nut. Aligning the pole to the substructure Check the alignment of 2.12 Installing the drive shaft the portal with a spirit...
Page 13
Installation Overview Square shaft, short, 2-part, with coupling (removing Square shaft without coupling coupling) Motor unit with coupling (coupling only opened) Square shaft, short, 2-part, with coupling (removing coupling) Square shaft, long, 2-part, with coupling (removing coupling - only with 3 rafters) Fig.
Page 14
Installation Preparing the couplings Installing and coupling the motor unit [2] Motor unit: Release the screws Attach the motor unit to DIN912 M6x30 on the the bearing tube. installed coupling. The square shaft must be in- serted slightly. Screw in the screws DIN 912 M8x40 slightly.
Installation Installing and coupling the square shaft [3] (only Coupling the long square shaft [4] necessary in case of 3 rafters) Place the square shaft Slide the square shaft between the mounted into the console. square shafts. On both sides: Slide the square shaft Position the coupling into the coupling of the...
Installation 2.14 Installing the awning fabric Slide the awning fabric over the pin. INFO During the entire installation process, rest the awning fabric on mounting stands, for example. The awning fabric is installed from the rear to the front and with the projection and horizontal profiles at the same time.
Installation Press the bushing into Remaining travelling horizontal profiles with LED the projection profile. Pull the line loops through the opening in the fabric. Screw in the nut DIN 985 M8. Push the fabric up and push the lines through the drilled holes in the projection profile.
Installation 2.17 Installing the LED strip light rail Connecting the LED strip light rail Pass the LED line Parts description through the drilled hole in the projection profile. Strip the lines 11 mm. Connect the line of the Cover profile LED strip light rail LED strip light rail to the supply line using WAGO Clip holder...
Installation 2.21 Performing a functional check (What to do Press the end cap onto when?) the side cover. CAUTION Risk of crushing from failure to exercise care during operation. Persons who are located within the projection area may be injured. Keep the projection area clear of persons.
Installation 2.24 Finishing the installation Installing the side covers Slide the cover over the Installing the rain hood console. The two drilled INFO holes must be aligned Depending on the order depth, the rain hood vertically. consists of 2 or more parts. The middle parts are installed in the same way.
Page 21
Special feature of Perea P70 Extend the awning and keep it extended for approx. 1-2 days so that the adhesive of the awning fabric can harden properly. Retract the awning in the event of bad weather and extend it again at the next opportunity, leaving it extended.
Need help?
Do you have a question about the Perea P70 and is the answer not in the manual?
Questions and answers