JVC EF-S100FG Instruction Manual page 6

100" fixed polarized screen and stand
Table of Contents

Advertisement

Available languages

Available languages

The screen itself weighs 20kg and has a width of 2m; therefore, it is recommended that transport, packing and
installation, etc., be performed by two persons to prevent damage to the screen.
Stand-mounted installation
SF-L100FG(Fixed Polarized Screen), EF-S100FG(Screen Stand) and PK-F100BG(Support bar) are necessary.
(1) Install Angle adjusting plate
Install P-wAngle adjusting plate(L) and P-eAngle adjusting plate (R) on the back of the S-qScreen
Turn over S-qScreen with the logo mark facing downward. Install P-wAngle adjusting plate(L) on the left
plate and install P-eAngle adjusting plate (R) on the right plate attached to the screen and V frame using E-!2
Spanner.
Do not damage the screen surface.(Place a soft cloth or air cap on a flat surface and put the
screen on it.)
(2) Install P-q Horizontal screen stay
Install the P-qHorizontal screen stay on the back of the screen, insert P-tHexagon head bolts into the
holes in P-w and P-e Angle adjusting plates from outwards and temporarily fix them with P-yHexagon
nuts.
Tighten P-t Bolts and P-y Nuts with two spanners. Assembling the screen is now complete.
For M6
P-e
E-!2
For M6
E-y Hex nut
E-!2 Spanner
P-w
For M6
E-!2
P-q
– 6 –
P-r
P-t

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pk-f100bgSf-l100fg

Table of Contents