ABB HT573783 Operation Manual page 64

Table of Contents

Advertisement

Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
5 Maintenance / 5.5 Cleaning components mechanically
© Copyright 2018 . All rights reserved.
4. When the cartridge group is horizontal, secure one chain block to one
of the upper push-off threads using a swivel lifting eye and suspend
from the second crane.
5. Tighten chain block until entire cartridge group is suspended from
second crane.
6. Remove loop from first crane.
HZTL2498_EN
Revision C
April 2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl65-a33

Table of Contents