Page 1
INSTALLATION INSTRUCTIONS BOILING PANS WITH TILTING HEIGHT 600mm SmArT - SmArT VArIOmIx - SmArT PrOmIx READ BEFORE USE! DOC N ST0 9183-02 EDITION 16 | EN | 10-2018...
Page 3
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN WE'RE THINKING OF YOU Thank you for choosing an Electrolux product. This is a product that comes with decades of profes- sional experience and innovation; a sophisticated product that is intelligently designed and devel- oped with your needs in mind.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN SAFETY INSTRUCTIONS FOR SAFETY AND USE ImPOrTANT! disconnected from the mains supply (turn the Danger of fire, explosion and death main switch off or remove the fuses from the power supply), the gas supply turned off and •...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN Installation and initial operation information, please refer to section 4 of this manual. The electricity and water supply must be in- stalled and the appliance first operated by care- This appliance is intended for cooking food in...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN Residual risk Residual risks that cannot be avoided completely during development or are eliminated with the use of suitable safety devices, are marked on the machine. When the machine is installed, ensure there is sufficient free space around it to reduce the re- sidual risks.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN SPECIFICATIONS MODELS Smart Line Boiling Pans Voltage max. phase Heating Total power V / neutral Frequency current F. mod. Kg/h conductor 232218 Sm6B50 400 V / 3N 50/60 232219 Sm6B100 22.5 400 V / 3N...
50/60 36 / 29 232231 + 928160 Sm6P300 25 / 28 400 V / 3N 50/60 36 / 47 Smart Line Boiling Pans with ice water cooling Voltage max. phase Weight Total power V / neutral Frequency current F. mod.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN APPLIANCE IDENTIFICATION Rating plate The illustration shows an example of an unla- The eight-digit serial number (Ser. No.) on the belled nameplate and may differ from the one on nameplate contains the following information: your appliance.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN GENErAL INFOrmATION PACKAGING ENVIrONmENT Polyethylene: Help protect our environment Outer packaging All packaging materials used are environment- ally-friendly. They may be stored without risk, taken to a recycling centre or incinerated in spe- Polystyrene: cial waste incineration plants.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN RESPONSIBILITY / LIABILITY Liability applicable in the country in which the appliance is used. The manufacturer is exempted from all liability Storing the operating instructions for the product in the following cases: • Disregarding the information in this Installation...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN CUSTOMER SERVICE, REPAIR AND MAINTENANCE Service, repair and maintenance work must • Repairs and service on the appliances must only be carried out by Electrolux Profes- be carried out when heating elements have sional or Electrolux partner dealers.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN CLEANING Handling stainless steel • Avoid physical damage to the stainless steel surface, especially with other metals. If stain- The types of stainless steel used on industrial less steel comes into contact with iron (wire...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 10. TRANSPORT, HANDLING AND STORAGE 10.3 Notes on handling The transport, handling and storage of the ap- pliances must be carried out only by specialist workers who: Observe the following precautions to ensure safe handling: •...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN SPECIFICATIONS 11. TECHNICAL SPECIFICATIONS (Sm6B) Smart (SV6I) Smart Variomix ICE Boiling pan without agitator Boiling pan with Variomix agitator and option ice water cooling (Sm6V) Smart Variomix Boiling pan with Variomix agitator (SP6I) Smart Promix® ICE Boiling pan with Promix®...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.3 Frames and fixtures 12.3.1 Foundation frames Foundation or mounting frames and fixtures are supplied disassembled. These should be as- sembled according to the following instructions. NOTE Please follow these instructions • Check that the dimensions of the supplied...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.4 Boiling pans Sm6B, Sm6V, Sm6P 12.4.1 Single Stand 50L, 80L and 100L Fig. 5 1 Fixtures: PNC 928029 2 Alternative direction of drainage 12.4.2 Right column 50L 80L and 100L Fig. 6...
Page 24
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.4.3 Single stand 150L, 200L and 300L Fig. 7 1 Fixtures: PNC 928030 2 Alternative direction of drainage 12.4.4 Right column 150L, 200L, 300L Fig. 8 150L 200L 300L Connections: 1079 A Hot water: DN15 (g1/2”) internal thread...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.5 Boiling pans with option ice water cooling SV6I, SP6I 12.5.1 Single Stand 50L, 80L and 100L Fig. 10 1 Fixtures: PNC 928029 2 Alternative direction of drainage 12.5.2 Right column 50L, 80L and 100L Fig.
Page 26
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.5.3 Single stand 150L, 200L and 300L Fig. 12 1 Fixtures: PNC 928030 2 Alternative direction of drainage 12.5.4 Right column 150L, 200L, 300L Fig. 13 150L 200L 300L Connections: 1079 A Hot water: DN15 (g1/2”) internal thread...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.6 multi stand NOTE Please follow these instructions • Boiling pan with the option ice water cooling (SV6I and SP6I) can only stand on the far left in a multi-stand. Fig. 15 100L...
Page 28
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.6.1 Right column 50L, 80L and 100 Fig. 16 12.6.2 Right column 150L, 200L, 300L Fig. 17 Connections: In case of alternative connection from the rear: A Hot water: DN15 (g1/2”) internal thread a Hot water: DN15 (g1/2”) internal thread...
Page 29
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 12.6.3 Installation of boiling pans with 600mm tilting height combined with boiling pans with 400mm tilting height PNC range tilting height 600mm: 232218 - 232245 and 232149 PNC range tilting height 400mm: 232106 - 232164...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 13. INSTALLATION OF PANS BACK TO BACK To avoid a collision between pans when tilting, check the distance between frames according to the table below Fig. 18 13.1 models: Sm6B, Sm6V, Sm6P 13.2 models: Boiling pan with the...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 14. POSITIONING OF BOILING PANS IN THE FIELD 14.1 models: Sm6B, Sm6V, Sm6P Dismantle right columns front, side plate and rear. Disconnect the transport protection from the support leg. 3. Remove the right column from the bottom of the packaging.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 14.3 Adjustment of the boiling pans 14.4 Lid adjustment position The lid may have to be adjusted when installed. The pan’s position is adjusted with the aid of the The lid can be adjusted vertically, laterally and in two limit position switches A.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN CONNECTIONS 15. WATER CONNECTION Incoming water must be drinking water with the • Press Tip return and return the pan to the following properties: working position. Surplus water will run out • Degree of hardness 0.5-3.5° dH or 0.5-5° fH...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 16. ELECTRICAL CONNECTION 16.1 Potential equalisation The electrical installation must be performed by a qualified electrician. The electrical connections must comply with local indoor installation regu- The appliance must be connected to a lations and must not be altered.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 17. CONTROL PANEL Promix Agitator: Variomix Agitator: Fig. 23 On/Off 11 Increase speed Display 12 Decrease speed menu forwards 13 Tilting 14 Tip return menu back Increase value 15 Emergency stop Decrease value...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN AGITATOr 18. FILLING WITH GREASE The agitator bearing is filled with grease from the factory. Refilling of grease should take place during installation and then at the alarm “TImE FOR SERVICE” or at least every two years.
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN 20. MAINENANCE OF VESSEL BEARINGS The vessel bearings must be inspected and greased at the alarm “TImE FOR SERVICE” or at least every two years. 1 grease nipple Fig. 25 EN | 10-2018...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN ACCESSOrIES 21. FACTORY FITTED ACCESSORIES Designation Pan size 928100 Food temperature & HACCP 50-150 L 928101 Food temperature & HACCP 200-300 L 928102 Automatic water filling 50-300 L 928129 Automatic jacket cooling, electrically heated...
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN Designation Pan size 928155 Ice water cooling, electrically heated 150 L 928156 Ice water cooling, electrically heated 200 L 928157 Ice water cooling, electrically heated 300 L 928162 USB port 50-300 L 928167...