INSTALLATION AND USAGE MANUAL
Manufacturer: CIAT Sp. z o. o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki, POLAND
CX-5C SMOKE CONTROL DAMPER
EI 120 (v
CERTIFICATE OF CONSTANCY OF PERFORMANCE No. 1391-CPR-0104/2014-O1
1 –

INSTALLATION

Installation should be done by a professional who has been trained in the installation of fire safety elements.
1.1 –

OVERALL DIMENSION

To install the damper properly in vertical partition of brick or concrete the required overall dimension is D+50 mm.
1.2 –

FIXING AND INSTALLATION

Place the damper axially in the opening. In order to provide partition with fire resistance, it is absolutely necessary
to respect damper installation border line which is clearly marked on the label to be found on the damper casing. In
case of installation in the brick or concrete walls, filling should be made of masonry mortar or non-shrink grout.
NOTE:
While installing damper it is inadmissible to grime a control mechanism of the damper with mortar, glue or
-
paints. The control mechanism of the damper has to be absolutely protected until the masonry and painting
works are completed.
The damper blade has to remain closed during installation and until mortar is hardened. The damper casing
-
cannot be burdened during installation in partition wall. It can result in deformation of the casing and damage of
the damper blade.
Minimum clearance of 200 mm should be left for service between the nearest element of the building and the
-
mechanism.
1.3 –

INSTALLATION METHOD

CX-5C can be installed in the following vertical and horizontal spaces:
concrete walls thickness min. 110 mm,
-
wall from full bricks thickness min. 110 mm,
-
walls from aerated concrete thickness min. 110 mm,
-
concrete ceilings thickness min. 150 mm.
-
1.3.1 – VERTICAL PARTITION
Minimum thickness of concrete, aerated concrete or brick vertical partition is 110 mm. It is recommended to use
optional UM installation brackets to facilitate installation. Installation brackets are delivered flat and have to be
bended before installation of the product.
– h
– io) S1500C
ew
ow
CIAT Sp. z o.o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki – POLAND
tel.: (48) 91 432 35 20 – fax: (48) 91 432 35 36 – e-mail: info@gryfit.com – www.gryfit.com
IMU-BPP-030-C-2017.08.17 - 1/6
AAmulti
10000

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CX-5C and is the answer not in the manual?

Questions and answers

Summary of Contents for Gryfit CX-5C

  • Page 1 UM installation brackets to facilitate installation. Installation brackets are delivered flat and have to be bended before installation of the product. CIAT Sp. z o.o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki – POLAND tel.: (48) 91 432 35 20 – fax: (48) 91 432 35 36 – e-mail: info@gryfit.com – www.gryfit.com...
  • Page 2 Connect power supply cable and microswitches cables according to the table and electrical wiring diagram. Perform the test of power connections. CIAT Sp. z o.o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki – POLAND tel.: (48) 91 432 35 20 – fax: (48) 91 432 35 36 – e-mail: info@gryfit.com – www.gryfit.com...
  • Page 3 1.5.3 – CX-5C SMOKE CONTROL DAMPER with SDG actuator CIAT Sp. z o.o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki – POLAND tel.: (48) 91 432 35 20 – fax: (48) 91 432 35 36 – e-mail: info@gryfit.com – www.gryfit.com...
  • Page 4 The damper will close in less then 71s. Once it is closed remove the voltage supply from the actuator. To open smoke control damper CX-5C apply impulse to the electromagnet (recommended from 1s up to 3s), which will trigger the mechanism and close the damper within not longer than 30s. Once the mechanism was triggered it is necessary to fully close the damper in order to re-arm the mechanism.
  • Page 5 To close smoke control damper CX-5C apply voltage at actuator wires marked as 1 and 2. The damper will close after less then 30s. To open smoke control damper CX-5C apply voltage at actuator wires marked as 1 and 3. The damper will open after less then 30s.
  • Page 6 Distributor is the sole responsible entity for execution of guarantee to customers. CIAT Sp. z o.o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki – POLAND tel.: (48) 91 432 35 20 – fax: (48) 91 432 35 36 – e-mail: info@gryfit.com – www.gryfit.com...