Download Print this page

Advertisement

Quick Links

Cannes Summerhouse
Building Instructions
Please read the instruction carefully
and retain for future reference
12x8, 10x8
Covers Multiple
Sizes:
and 8x8
12x8 Cannes Summerhouse
8x8 Cannes Summerhouse
with French Doors
with French Doors
Building shown
Building shown
For Queries and Help please contact 01777 802300
Please note that all images are for illustration purpose only.
V1.6 08.05.21 INS0070

Advertisement

loading
Need help?

Need help?

Do you have a question about the Cannes Summerhouse and is the answer not in the manual?

Questions and answers

Summary of Contents for Project Timber Cannes Summerhouse

  • Page 1 Please read the instruction carefully and retain for future reference 12x8, 10x8 Covers Multiple Sizes: and 8x8 12x8 Cannes Summerhouse 8x8 Cannes Summerhouse with French Doors with French Doors Building shown Building shown For Queries and Help please contact 01777 802300 Please note that all images are for illustration purpose only.
  • Page 2: Important Safety Notices

    - Construct your building within one month of delivery to stop parts warping / bowing. - Treat your building annually with a quality timber treatment to comply with the buildings warranty. ADDRESS: Project Timber Ltd, Parry Business Park, Grassthorpe Road, Sutton-on-Trent, Newark, Notts, NG23 6QX SPARE PARTS...
  • Page 3 For Queries and Help please call Product Support: PRODUCT MAINTENANCE CHECK LIST: CLADDING STYLE PANEL ORIENTATION 01777 802300 Wooden Sheds / Playhouses / Summerhouses Shiplap Cladding: It is essential to ensure that the panels of your This style of building are in the correct orientation. Assembly cladding allows the timber to TROUBLE SHOTTING GUIDE in the wrong orientation may lead to water...
  • Page 4 8ft Gable Cannes Summerhouse Buildings 12x8 Cannes 10x8 Cannes Summerhouse with Summerhouse with French Doors shown French Doors shown 8x8 Cannes Summerhouse with French Doors shown...
  • Page 5 8ft Gable Cannes Summerhouse Floor Assembly 12x8 Floor Assembly 10x8 Floor Assembly 8x8 Floor Assembly 1199mm x 1172mm (2) 1199mm x 1172mm (6) 1199mm x 1172mm (4) 1199mm x 879mm (4) 8ft Gable Cannes Summerhouse Roof Position 12x8 Roof 10x8 Roof...
  • Page 6 8ft Gable Cannes Summerhouse Back Panels Position 12x8 Back Panels Position 10x8 Back Panels Position 8x8 Back Panels Position 4ft Plain 4ft Plain 3ft Plain 3ft Plain 4ft Plain Panel Panel Panel Panel Panel 4ft Plain 4ft Plain 4ft Plain...
  • Page 7 Floor Stages For Floor Insulation only Floor Stages Back 12x8 Floor Lay and align Pilot drill holes assembly the Floors before fixing Back Front Screws Fix the Floors Before constructing the Side together, with building, cut the insulation screws in angled foil to size and staple to the *All Garden Buildings must be built on level, position...
  • Page 8 Fix the Left Gable Panels Fix the Back Panels, secure the to the back panel panels to the floor panels Front Plain Panel position Side Front Pilot drill holes Front S50 Screws Pilot drill holes Front before fixing Screws before fixing Front Fix the Valance Panel Pilot drill holes...
  • Page 9 Truss fixing stage Fit the Door Drip Catcher and fix at the back of valance panel Screws Screws Back Front Fix the Truss Front to the panels Fix the Door Pilot drill holes Pilot drill holes Pilot drill holes Threshold Screws before fixing Front...
  • Page 10 Centre Purlin Position Roof Support Brace fixing Roof Support Brace fixing Pilot drill holes Screws before fixing Screws 879mm 879mm 879mm or 1172mm or 1172mm or 1172mm Detail Detail Pilot drill holes before fixing Position and fit the Roof Support Brace in Detail Detail between the 1172mm distance between the...
  • Page 11 For Tongue and Groove Roof Panel ONLY Roof Panel fixing ONLY Roof Panel fixing ONLY Roof Panel fixing ONLY Position the Roof Panel to the Pilot drill holes Pilot drill holes before fixing before fixing top of truss and panels Screws Pilot drill holes before fixing...
  • Page 12 For OSB Roof Sheet ONLY Roof Sheet ONLY Roof Sheet fixing ONLY Roof Sheet fixing ONLY Position the Roof Sheet to the top of truss and panels Nails Back Nails Fix the Roof Sheet Fix the Eaves Purlin to the truss, roof to the Roof Sheet support and panels Back...
  • Page 13 Window Glazing fixing Door Hinge fixing Door Hinge fixing Detail A Fix the Hinges Place the Glazing at the back of into Window Gable the Door Frame Panel and fit the Beading around the edges Use Cardboard Screws to protect the Glazing when Detail B fitting the...
  • Page 14 Door Beading position Door Hinge fixing Door Hinge fixing Screws Pilot drill holes Front Important: before fixing Hung the doors and secure the Door Beading fitted on the Screws door hinge to the wall panels. front of the door Tower Bolt Fixing Door Handle fixing Tower Bolt fixing Screws...
  • Page 15 Door Lock fixing Press Lock Fixing Door Lock Block fixing Fix the Press Lock over keyhole. Screws The lock fits centrally Fix the Press Lock and to the door frame. Pilot drill holes It will overhang the sides Door Lock Block before fixing of the frame slightly.
  • Page 16 Door Cloaking fixing Door Cloaking fixing Roof Packer fixing for TG Roof Screws Screws Pilot drill holes Fit and fix the Door before fixing Cloaking Strips at the back of the door Fit and fix the Door Cloaking Screws Strips at the front of the door Roof Felt fittings Roof Felt fittings Roof Packer fixing for OSB Roof...
  • Page 17 Roof Felt fittings Roof Felt fittings Roof Felt fittings Tack Top corners T10 Felt to hold in place Tacks T10 Felt Tacks Tack every 100mm Cloaking Strip fixing Cloaking Strip fixing Roof Felt fittings Cut to size The Felt must lay on Nails Nails the top of each other...
  • Page 18 Fascia fixing Finials fixing Nails Panel Pilot drill holes Pins before fixing...