Continuous Base Instructions - SUMMIT LOCKERS HDPE Installation Manual

Table of Contents

Advertisement

H D P E L O C K E R I N S T A L L A T I O N M A N U A L

Continuous Base Instructions

Assemble bases with "L"
brackets per non-welded
corners. The longer part of the
base should cover the end of the
shorter part.
Line up bases so they are square
and flush with the back of the
lockers.
3 1/4" in from the front of the
lockers, drill a pilot hole straight
down.
Screw the locker to the base
with hardware provided.
803-403-8816 | WWW.SUMMITLOCKERS.COM | INFO@SUMMITLOCKERS.COM
SUMMIT LOCKERS, INC. - 138 MCLEOD ROAD, COLUMBIA, SC 29203

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HDPE and is the answer not in the manual?

Questions and answers

Table of Contents