Download Print this page

Advertisement

Quick Links

Mounting instructions

Advertisement

loading
Need help?

Need help?

Do you have a question about the Homebox Modular and is the answer not in the manual?

Questions and answers

Summary of Contents for EastSide Impex Homebox Modular

  • Page 1 Mounting instructions...
  • Page 2 HOMEBOX MODULAR is a patented product of EASTSIDE impex Handelsgesellschaft mbH Inventors of the portable grow room Liselotte-Herrmann-Str.31 • 10407 Berlin - Germany T: +49 30 470 042 83 • F: +49 30 260 793 35 info@hbmodular.net • www.hbmodular.net...
  • Page 3 Choose your shape 1x1 ULM 3x3 BERLIN 2x2 BREMEN Pg.6 Pg.50 Pg.90 1modular unit = 120cm x 120cm x 200cm 2x1 HAMM Pg.12 3x2 KIEL Pg.60 L-2x2 ESSEN 3x1 MAINZ Pg.100 Pg.20 4x2 LEIPZIG Pg.70 4x1 FRANKFURT pg.29 L-3x2 POTSDAM 5x2 DRESDEN Pg.109 Pg.80...
  • Page 4 welcome Set contents Set 1 Set 2 Set 3 Poles The inventors of the original portable grow room are proud to present you a new revolutionary, patent pending, modular grow box that enables you to fully customize your garden space to the shape that best suites you.
  • Page 5 General parts index Entrance Plain Floor basin Ventilation Roof tops panels panels panels 120cm x 120cm 120cm x 120cm 120cm x 200cm Size of panels: Velcro basin connector Roof support column Connectors Poles Roof ring Strap Spare parts = corner 3-way = side 4-way...
  • Page 6 3x1 MAINZ Actual size: 360cm x 120cm x 200cm Composed of: 1x set 1 2x set 2...
  • Page 7 √ Check items Parts list Roof tops Velcro basin Poles Floor basin connector 2 0 x Strap Connectors Panels 3-way = corner 4-way = side Spare parts 3-way 5-way...
  • Page 8 Example Plan your box Plan out your box Plan out your box by deciding where ventilation, electri- cal and water access is located. Designate Px2 (Panel), Ex3 (Entrance) or Vx3 (Ventilation) on your modular box floor plan according to your design. Calculate the amount of panels with type of connectors (corners = 3-way, sides= 4-way,...
  • Page 9 Designate panels 4 way 4 way 3 way 3 way 3 way 3 way 4 way 4 way Calculate panels 3 way = 3 way = 3 way = 4 way = 4 way = 4 way =...
  • Page 10 Assemble panels Create vertical poles by con- necting pole nº2 to pole nº3. Insert vertical pole in vertical slot. Place appropriate connectors according to calculations in step Insert no.1 poles in horizontal slots (top and bottom) Push horizontal poles into con- nectors of vertical pole.
  • Page 11 Work in counter clockwise direction Assemble Box Work from outside of the box. Connect the first 2 pan- els creating a corner by plac- ing poles from the panel on your left into the connectors of the panel on your right. b, c, d, Working in count-...
  • Page 12 Equipment poles Place poles 4 & 5 were needed for hanging equipment. Fasten vertical velcro on all panels.
  • Page 13 Roof top Extend Roof Tops on floor and unite them by placing one over the other aligning velcro strips. Connect side flaps by tucking velcro under- neath. Flip the roof top so white side is facing up, roll top for easy mounting. c, d.
  • Page 14 Floor basin Place first Floor Basin inside and open lower corners of the pan- els. Take corner velcro strips of basin and wrap them around the poles from the inside out. Smoothly con- nect velcro on sides of basin to walls.