Installation - Herida Healthcare Argyll II HH/P09 User & Full Service Manual

Pressure relieving / alternating air mattress & pump
Table of Contents

Advertisement

OPERATION
Image 1DA
(NB: use hand to check ensure appropriate clearance when profiled as below. Add more pressure
on the pump if required in order to achieve this. NB: Weight setting is a guide only and cell
pressure must also be taken into consideration for individual patients). Clinical judgement must
always overrule user guidance.
Image 2DA

Installation

1. Remove all packaging & place the pump either at the end of the bed on its hooks or on a
flat surface.
2. Ensure that there are no sharp or hard objects on the bed before unfolding the mattress &
laying out flat. The air inlet should be located at the feet side of the bed.
3. Use the Rapid Inflator (if available) to inflate the mattress before connecting the air tubes to
the pump. The tubes should be connected securely in place without any signs of leakage. If
a Rapid Inflator is not available, the mattress will take approximately 50 minutes to inflate.
NB: The pump will not operate dynamically until the inflation setting is reached.
4. Connect the pump to the socket & switch on.
5. Adjust the mode & pressure by the users condition & weight to suit.
6. In order for the alarm to activate, the system must be switched on & powered up for at least
5 minutes. This should give the internal battery on the PCB sufficient time to charge.
7 |
P a g e
Argyll II™ User/Service Manual
J A N U A R Y 2 0 2 0

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Argyll II HH/P09 and is the answer not in the manual?

Questions and answers

Jasmi Joseph
April 18, 2025

What is the protocol if the power goes off when the air mattress is in use. How long the air will be retained. Is there anything to be done to keep the air in if there is power outage

This manual is also suitable for:

Argyll ii hh/t04

Table of Contents

Save PDF