Download Print this page

Panasonic Factory Line 20 Instruction Manual page 6

Advertisement

hangers (with bolt) (without bolt) instalation
5
hanger instalation
・The standard interval for mounting of the hangers is 1 m, and the maximum interval is 1.5 m.
・Be sure to mount the hanger bolts securely to a structural member.
・DH2652 hangers (without bolt) come without hanger bolts.
・To mount the DH2652 hangers, Use M8 bolts.
Installation of the duct
1.
Loosen the cap securing screw and
turn the cap to the left to remove it from
the hanger.
hanger bolt
cap
Loosen
2.
Spread apart the hanger and match the
polarity indication on the duct with the
polarity indication on the hanger.
Spread apart.
Factory Line
20 duct
Hanger
Polarity indication
Standard 1 m, maximum 1.5 m
hanger bolt
Factory Line 20 duct
Hanger
Caution
Ensure the strength of building structures enough 
to support the hanging weight (a maximum of 10 
kg per support). 
 Not doing so may cause the hanger to drop.
To use long hanger bolts, mount these bolts using 
sway braces.
Use two or more pieces of hanger for one duct.
 It will become a cause of fall if it does not so
To prevent the ducts from meandering, align the 
hanger centers.
 Not doing so may cause the hangers to drop.
Fit the duct into the hanger, and then turn 
3.
the cap to the right and tighten the securing 
screw in order to secure the duct.
Spread apart.
Match the polarity
indications.
Mount the hanger
from the polarity marking side
Caution
Turn the cap until it is fully locked.
 Not doing so may cause the duct to drop.
6
Tighten

Advertisement

loading