Taking The Engine Out Of Operation For Up To 12 Months - ABB HT562660 Operation Manual

Table of Contents

Advertisement

© Copyright 2014 ABB. All rights reserved.
Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Mothballing the turbocharger
Taking the engine out of operation for
up to 12 months
The rotor and bearing parts must be dismantled and subsequently
refitted by an ABB Turbocharging Service Station
Clean all parts
Coat plain surfaces of steel and cast parts with anticorrosive oil
Fit turbocharger completely.
Rotation of the rotor in the stack draught
If the rotor turns as a result of the stack draught:
Install a blind flange between the outlet flange of the compressor
casing and the charge air duct.
10
10.1
Page 112

Advertisement

Table of Contents
loading

Table of Contents