Fig. 58: Installing The Cartridge Group; Table 41: Tightening Torque (51007) - ABB HT610961 Operation Manual

Turbocharger
Table of Contents

Advertisement

Operation Manual / A130-M.. - A145-M..
9 Dismantling and fitting / 9.15 Installing the cartridge group
Installing the cartridge group
Fig. 58: Installing the cartridge group
Product
A130
A135
A140
A145
Table 41: Tightening torque (51007)
1. Coat the threads of the studs (51006) with high-temperature grease.
2. Align the casing position of the cartridge group to the marking.
3. Lower the cartridge group into the turbine casing.
4. Remove ring nuts and screws.
5. Fit fastening strips (51002) with Verbus Ripp® washers (51003) and hexagon
nuts (51007).
6. Tighten the hexagon nuts (51007).
© Copyright 2022 ABB. All rights reserved.
Size
Tightening torque [Nm]
M8
M10
M12
M12
HZTL4031_EN
25
45
75
75
Rev.P
February 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

1006365741

Table of Contents