Page 2
SZU020 Youthzone Unit Installation Instructions Rev 02 Check using the Parts List that none of the components are missing. Plan the final position of the ball court ensuring there is sufficient space. Ensure the ground surface is level Excavate the foundation holes in accordance with the plan.
Page 3
SZU020 Youthzone Unit Parts list Rev 02 SZA028 SZA030 TZA060 SZA050 SZA040 SZA070 SZA050 SZA020 SZA022 Description TZA060 Basketball goal SZA040 Cross bar frame SZA020 2.5m Lower panel no rubber SZA050 1.1m Lower panel no rubber SZA030 2.5m Upper panel no rubber SZA028 2.5m Upper plain panel...
Page 4
SZU020 Youthzone Unit Maintenance Instructions NOTE The warranty is invalidated if these instructions are not followed. Recommended Regular Inspection and Maintenance Interval Days Check stability of structure, tighten connections if required. Check all uprights at ground level for corrosion and/or rot.
Need help?
Do you have a question about the SZU020 and is the answer not in the manual?
Questions and answers