3.1 Accessory List ........................... 5 3.2 Component Physical Information .................... 6 Identifying Your System ....................... 7 4.1 S9510-28DC DC Version Overview ..................7 4.2 S9510-28DC AC Version Overview ................... 8 4.3 DC Version PSU Overview ......................9 4.4 AC Version PSU Overview ...................... 10 4.5 Fan Overview .........................
Page 3
12.2 Connecting a Cable to the ToD Interface................23 12.3 Connecting the GNSS Interface ................... 23 12.4 Connecting the 1PPS Interface .................... 24 12.5 Connecting the 10MHz Interface ..................24 12.6 Connecting the Transceiver ....................25 13 Cautions ..........................26 S9510-28DC Hardware Installation Guide | ii...
1 Overview The UfiSpace S9510-28DC is a high-performance, versatile open networking white box router that is designed to address the changing needs of backhaul transport requirements as Telecoms make the transition from legacy technologies towards 5G. It enables telecoms and service providers to deploy disaggregated open network infrastructure to lower costs and rapidly scale existing services for edge computing, mobile backhaul, and broadband access applications.
1.06 inches (2.7cm). Therefore, to accommodate the fan and power supply handles, a minimum space clearance of 2 inches (5.1cm) is needed at the front and back of the S9510-28DC. A total minimum reserve depth of 16 inches (40.6cm) is required.
• Cooling: The S9510-28DC airflow direction is front-to-back. Make sure the equipment on the same rack have the same airflow direction. Figure 3. Figure 4. Preparation Check List Task Check Date Power voltage and electric current requirement DC version: -48V DC, 16-8 ampere maximum or;...
Screw kit for rack mount bracket 0.1lbs (6.5g) per set and adjustable mounting rail 17.32” x 11.89” x 1.713” S9510-28DC (W x D x H) (440 x 302 x 43.5mm) Dimension PSU (W x D x H) 1.99” x 8.31” x 1.58” (50.5 x 211 x 40.2mm) Fan (W x D x H) 1.57”...
Figure 8. DC Version PSU Overview 1+1, hot swappable power supply unit (PSU) field replaceable unit (FRU). Figure 9. Figure 10. S9510-28DC Hardware Installation Guide | 9...
AC Version PSU Overview 1+1, hot swappable power supply unit (PSU) field replaceable unit (FRU). Figure 11. Figure 12. Fan Overview 4+1, hot swappable fan field replaceable unit (FRU). Figure 13. S9510-28DC Hardware Installation Guide | 10...
M4.0*L6.5mm screws provided in the package. Then secure the adjustable mounting rail to the rack posts using the screws and cage nuts provided (See Figure 18). Illustrations are for reference purposes only. Actual cabinet posts may differ. Figure 17. Figure 18. S9510-28DC Hardware Installation Guide | 12...
4. Carefully slide the new fan module into the fan bay and gently push until it is flush with the case. 5. Secure the captive screw on the fan module to lock the fan in place. Figure 21. S9510-28DC Hardware Installation Guide | 13...
1. Locate the release tab on the PSU. Then press and hold down the release tab to unlock the PSU from the power bay. 2. While holding down the release tab, grip the PSU's handle and firmly pull it out of the power bay. DC Version: AC Version: Figure 23. S9510-28DC Hardware Installation Guide | 14...
Page 18
5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction. Illustrations are for reference purposes only. Actual cabinet posts may differ. DC Version Figure 24. AC Version Figure 25. S9510-28DC Hardware Installation Guide | 15...
3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with package contents). 4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 26. S9510-28DC Hardware Installation Guide | 16...
Page 20
6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to either of the designated grounding locations on the router. Figure 27. Figure 28. Figure 29. S9510-28DC Hardware Installation Guide | 17...
5. Verify that the power supply is operating. If connected correctly, when turned on, the LED on the PSU will light up with a Green color designating normal operation. S9510-28DC Hardware Installation Guide | 18...
Plug the power cord into the AC PSU and secure it tightly. 3. Verify that the power supply is operating. If connected correctly, when turned on, the LED on the PSU will light up with a Green color designating normal operation. Figure 32. S9510-28DC Hardware Installation Guide | 19...
Blinking Green **Note: need NOS to activate this feature Solid Yellow System timing core is in acquiring state or holdover mode. System timing synchronization fail. Blinking Yellow **Note: need NOS to activate this feature S9510-28DC Hardware Installation Guide | 20...
Fan is present but interrupt assert. Management port LED Left LED Condition Equipment Status 1G no link Green-solid 1G link-up Green-blinking 1G TX/RX activity Right LED Condition Equipment Status No activity Amber-solid 10M/100M link-up Amber-blinking 10M/100M TX/RX activity S9510-28DC Hardware Installation Guide | 21...
After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. The username and password should be provided by the Network Operating System (NOS) vendor. S9510-28DC Hardware Installation Guide | 22...
Figure 36. Connecting the GNSS Interface Connect an external GNSS antenna with an impedance of 50 ohms to the port marked “GNSS ANT” located on the front panel of the router. S9510-28DC Hardware Installation Guide | 23...
Connect an external 1PPS cable with an impedance of 50 ohms to the port labelled “ 1PPS”. Figure 38. Connecting the 10MHz Interface Connect an external 10MHz cable with an impedance of 50 ohms to the port labelled "10MHz”. Figure 39. S9510-28DC Hardware Installation Guide | 24...
3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and use gentle pressure to secure it in place. An audible click can be heard when the transceiver is secured in the port. S9510-28DC Hardware Installation Guide | 25...
The equipment and its modules should only be repaired, maintained or replaced by skilled personnel. Instructed person is a term applied to persons who have been instructed and trained by a skilled person, or who is supervised by a skilled person. S9510-28DC Hardware Installation Guide | 26...
Need help?
Do you have a question about the S9510-28DC and is the answer not in the manual?
Questions and answers