Maintenance; Solid Shelf Installation & Removal - Zero Zone HYBRID Installation, Operation & Maintenance Manual

Medium & low temp display case
Table of Contents

Advertisement

MAINTENANCE

Solid Shelf Installation & Removal
INSTALLATION: Determine the correct shelving location. While lifting the front of the shelf up at
a slight angle, insert the shelf tangs into the slots in the shelf standards at the back of the case,
making sure the shelf is level left to right. Lower the front of the shelf while continuing to move
the shelf tabs into the standards and until the shelf is held securely by the standards.
REMOVAL: Tilt the front of the shelf up while lifting the entire shelf up and pulling out until the
shelf tangs clear the shelf standards.
Maintenance - Solid Shelf Installation & Removal • 25

Advertisement

Table of Contents
loading

Table of Contents