Sharp ND-158E1F General Installation Manual page 5

Pv modules
Hide thumbs Also See for ND-158E1F:
Table of Contents

Advertisement

INSTALLATION MANUAL FOR PHOTOVOLTAIC MODULES
INSTALLATION
Mounting Using Frame Bolt Holes (Figures 1 & 2)
Mounting Using Clips on Long Edge of Module: Long Edge Parallel to Array Rails (Figure 4)
Mounting Using Clips on Long Edge of Module: Long Edge Perpendicular to Array Rails (Figure 5)
8
2
6
7
9
2
7
5
6
7
0
6
125
350
1
0
D
D
1000V
PVU-B50
IP65
C E
PVU-B50
C
C
C
C
D
C
C
- 4
R
2
5 .
D
- 4
R
3
(
1
9
6 .
(
1
9
6 .
)
30mm Min.
Catch length
Clip
5mm Min.
Catch width
Frame
10mm Min.
Rail
Support width
ELECTRICAL INSTALLATION INSTRUCTION
All manuals and user guides at all-guides.com
NT-170E1
1.
1.
BOLT M8 x 20mm
(BOLT 5'16" x 3/4")
3.
3.
)
g
g
6.4" (162mm) <
NT-175E1
SOLAR MODULE
2.
WASHER
SOLAR MODULE
2.
WASHER
BOLT M8 x 20mm
(BOLT 5'16" x 3/4")
4.
4.
WASHER
WASHER
SPRING WASHER
SPRING WASHER
NUT
NUT
g
g
g
< 15.5" (393mm)
u
u
u
u
u
6.4" (162mm) <
< 15.5" (393mm)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nd-162e1dNd-162e1fNd-170e1dNd-170e1fNd-180e1

Table of Contents