Summary of Contents for SolaX Power X3-MIC G2 Series
Page 1
(including software, etc.), and no reproduction or distribution of it in any form or by any means. All rights reserved. SolaX Power Network Technology (Zhejiang) Co.,Ltd. reserves the right of final interpretation.
Contents Contents 1 Note on this Manual 1.1 Scope of Validity 1.2 Target Group 1.3 Symbols Used 2 Safety 2.1 Appropriate Usage 2.2 Important Safety Instructions 2.3 Explanation of Symbols 2.4 CE Directives 3 Introduction 3.1 Basic Features 3.2 Terminals of Inverter 3.3 Dimension 4 Technical Data 4.1 DC Input...
7.1 Trouble Shooting 1.1 Scope of Validity 7.2 Routine Maintenance This manual is an integral part of X3-MIC G2 Series. It describes the assembly, installation, commissioning, maintenance and fault of the 8 Decommissioning product. Please read it carefully before operating.
2.1 Appropriate Usage impulse D1) for signal line according to EN 61632-1. The X3-MIC G2 Series are PV inverters which can convert the DC current of All DC cables should be installed to provide as short a run as possible, and positive and negative cables of the string or main DC supply should be bundled the PV generator into AC current and feed it into the public grid.
(35 VDC) inside the device. Warning ! Authorized service personnel must disconnect both AC and DC power from X3-MIC G2 series before attempting any maintenance or cleaning or working on any circuits connected to the X3-MIC G2 series.
Safety Safety PE Connection and Leakage Current Symbols on the Type Label • The end-use application shall monitor the protective conductor by residual Symbol Explanation current operated protective device (RCD) with rated fault current Ifn≤240 mA which automatically disconnects the device in case of a fault. CE mark.
Safety Introduction 3. Introduction 2.4 CE Directives This chapter follows the requirements of the European low voltage directives, 3.1 Basic features which contains the safety instructions and conditions of acceptability for the endues system, which you must follow when installing, operating and Thanks for your purchasing with SolaX X3-MIC G2 Serial inverter.
(including software, etc.), and no reproduction or distribution of it in any form or by any means. All rights reserved. SolaX Power Network Technology (Zhejiang) Co.,Ltd. reserves the right of final interpretation.
Installation Installation 5.3 Installation Precaution 5.4 Installation Steps X3-MIC G2 Series inverter is designed for outdoor installation (IP 66). Ø Preparation Make sure the installation site meets the following conditions: Below tools are needed before installation. Not in direct sunlight.
5.5.1 The Main Steps to Connect to the Inverter Ø PV String Connection Wire crimper recommended model : X3-MIC G2 series inverters have a couple of PV connectors which can be H4TC0001 connected in series into 2-strings PV modules. Please select PV modules with manufacturer: Amphenol excellent function and reliable quality.
Page 12
Grid Connection contact through the cable nut. X3-MIC G2 series inverters are designed for three phase grid. Rated grid voltage f ) Insert the wire into plug forcibly, when a "click” is heard or felt the pin contact is 230 V, frequency is 50/60 Hz. Other technical requests should comply with assembly is seated correctly.
Page 13
Installation Installation Connection Steps g) Tighten the screw of the back shell and the male insert. a) Check the grid voltage and compare with the permissive voltage range (refer to technical data). b) Disconnect the circuit-breaker from all the phases and secure against re- connection.
Page 14
Installation Installation Selection of Fuses and Cables Connection Earth Connection Ø Mains cable (AC line cable) shall be short-circuit protected and thermal overload Screw the ground screw with the allen wrench shown as follows. protected. Always fit the input cable with fuse. Normal gG (US: CC or T) fuses will protect the input cable in short circuit situation.
Page 15
5. Insert the cable into the RS485/Meter port of the inverter, and tighten the waterproof connector. b. Meter(optional) A meter can communicate with the X3-MIC G2 series inverter through this Meter Connection Steps: interface, then you can: Please see the Quick Installation Guide for three-Phase Meter for details.
Page 16
Installation Installation Upgrade 3) Then insert the U-disk into the DONGLE port on the bottom of the inverter. Then turn on DC switch and connect the PV connector, the LCD The inverter system can be updated through an U-disk. will show a picture as below. Make sure the input voltage is more than 140 V (in good illumination condition), or it may result in failing during updating.
Installation Operation Method 6. Operation Method 5.6 Run the inverter Start inverter after checking all below steps: a) Check that device is xed well on the wall. 6.1 Control panel b) Make sure all the DC breakers and AC breakers are OFF. c) AC cable is connected to grid correctly.
Operation Method Operation Method 6.2 LCD Display 6.3 LCD Function & Operation *User can see the U, I • level 1 & F of the grid. a) The first line displays the parameters(Power, , Today and Total) and the Pgrid (Ua,Ia,Fa,Ub,Ib,Fb,Uc values.
Page 19
Operation Method Operation Method **Previous page Enter >Country >Safety Enter Enter >VDE4105< >P(freq) >P(Overfreq) >Grid Services **Go to next page Back Down Back Back Back Back Enter Enter >Mode Select >User Value Down >Export Control >Meter/Disable< 30000W >P(Underfreq) **Go to next page Back Back Down...
Page 20
Operation Method Operation Method Enter > Pu_3Tau > O/V 10min En >Grid Protection >Disable< 10.0S Ø LCD Digital Display Back The main interface (Level 1) is the default interface, the inverter will Down Down automatically jump to this interface when the system started up >VacOvp1stTime successfully or not operated for a period of time.
Page 21
Operation Method Operation Method ﹦﹦﹦﹦ Grid ﹦﹦﹦﹦ Ÿ Settings Setting function is used for setting the inverter for safety, connection, Grid 0.0 V and so on. 0.0A * Password The default password is “2014” for the end user, which only allows the user to b) Solar Review the current setting and some easy setting.
Page 22
Operation Method Operation Method b) Export Control With this function the inverter can control energy exported to the grid. ﹦﹦﹦﹦ ﹦﹦﹦﹦ P(freq) Whether having this function is based on user’s wishes. If reset is needed, any changes Choose ”Meter” in ”Meter/Disable” means user must install a meter to monitor should be made according to Enable/Disable energy exported to the grid.
Page 23
Operation Method Operation Method Grid Protection 4-2. Usually end user do not need to set the grid Protection. All default value have Reactive power control, Reactive standard curve cos φ = f(P) been set before leaving factory according to safety rules. For VDE ARN 4105, curve cos φ...
Page 24
Operation Method Operation Method Reset Energy Machine Type The user can clear the power energy by this function. The user can check the Machine Type by this function. Machine Type Reset Energy Machine Type Mode Select 15.0-T >YES/NO< PV Connection The user can select the PV connection type by this function.
Press “Up” and “Down” to review the values. This section contains information and procedures for solving possible ﹦﹦﹦﹦ ﹦﹦﹦﹦ problems with X3-MIC G2 series inverters, and provides you with Meter Energy troubleshooting tips to identify and solve most problems that could occur Today Import: with the X3-MIC G2 series inverters.
Troubleshooting Troubleshooting ● If the information panel of your inverter does not show the Fault light, check Faults Diagnosis and Solution the following list to make sure that the present state of the installation allows Overcurrent Protection Fault. proper operation of the unit. -Check the connections of the inverter.
8. Decommissioning 9. Disclaimer 8.1 Dismantling the Inverter The X3-MIC G2 series inverters are transported, used and operated under limited condition, such as environmental, electrical etc. Disconnect the inverter from DC Input and AC output. SolaX shall not be liable to provide the service, technical support Wait for at least 5 minutes for de-energizing.
Page 28
Warranty Registration Form For Customer (Compulsory) Country Name Phone Number Email Address Zip Code State Product Serial Number Date of Commissioning Installation Company Name Installer Name Electrician License No. For Installer Module ( If Any ) Module Brand Module Size(W) Number of String Number of Panel Per String Battery ( If Any )
Page 29
PLEASE REGISTER THE WARRANTY IMMEDIATELY AFTER INSTALLATION! GET YOUR WARRANTY CERTIFICATE FROM SOLAX! KEEP YOUR INVERTER ONLINE & WIN SOLAX POINTS! Open your Wait for the camera app camera to and point recognize your device the QR code at the QR code Notification Click the notification banner...
Need help?
Do you have a question about the X3-MIC G2 Series and is the answer not in the manual?
Questions and answers