Download Print this page

Advertisement

Quick Links

Reporter Quick Start Guide
RP-S500 Appliance
Figure 1: RP-S500 Deployment
1 — Unpack the Appliance
Unpack the shipping package for the appliance and verify it
includes the following:
RP-S500 appliance
(2) AC power cords
(1) Null-modem serial cable
Grounding Hardware
2- and 4-post slide-rail kit
Accessing Appliance Documentation
Software License Agreement
Hardware Warranty Information
Broadcom, the pulse logo, Connecting everything, Avago Technologies, Avago, the A logo, Symantec, the Symantec logo, the Checkmark logo, Blue Coat, and the Blue Coat
logo are among the trademarks of Broadcom and/or its affiliates in the United States, certain other countries, and/or the EU. Copyright © 2021 Broadcom. All Rights Reserved.
The term "Broadcom" refers to Broadcom Inc. and/or its subsidiaries. For more information, please visit www.broadcom.com.
2 — Connect Cables
It is recommended that you plug in cables, verify LEDs, and
configure and license the appliance before mounting it in an
equipment rack. Make sure the appliance is on a flat, level
surface when performing the initial configuration. If you would
rather mount the appliance before performing configuration
tasks, skip to
Mount the
Appliance.
The following procedure describes a typical deployment for
RP-S500 appliances (as shown in
on other deployments, see the Reporter software documenta-
tion, available at:
techdocs.broadcom.com
24 Aug 2021
Figure
1). For information

Advertisement

loading
Need help?

Need help?

Do you have a question about the RP-S500 and is the answer not in the manual?

Questions and answers

Summary of Contents for Symantec RP-S500

  • Page 1  Broadcom, the pulse logo, Connecting everything, Avago Technologies, Avago, the A logo, Symantec, the Symantec logo, the Checkmark logo, Blue Coat, and the Blue Coat logo are among the trademarks of Broadcom and/or its affiliates in the United States, certain other countries, and/or the EU. Copyright © 2021 Broadcom. All Rights Reserved.
  • Page 2 RP-S500. figured state. 4. Connect an Ethernet cable to the RP-S500’s LAN 2:0 port After the boot cycle has completed, the LCD panel dis- ...
  • Page 3 5. To download and install the license, enter: NOTE: The first time the RP-S500 boots, it requires approx- license download imately 5 minutes to initialize the RAID array, after which the appliance begins a one-time RAID synchronization that 6.
  • Page 4: Verify Connectivity

    2. When prompted, enter the admin Username and Pass- word, then click Login. The Management Console win- (2) Inner rails dow opens. (2) Rear brackets (4) Middle brackets (8) M6x13 screws (8) M6 cage nuts (10) M4x5L screws (4) M4x4L screws RP-S500 Rail Kit RP-S500...
  • Page 5: Rack Warnings And Precautions

    Do M4x5L Take adequate safety and grounding measures to avoid not yet fully tighten the side-mounting screws.  creating an electrical shock hazard and to prevent bodily injury. Figure 2: RP-S500 Slide-Rail Installation RP-S500...
  • Page 6 Power On the Appliance and Verify LEDs. See below for support and additional documentation. Symantec Technical Support For Symantec technical support, case management,  licenses, and product downloads, go to: support.broadcom.com/security Reporter Software Documentation techdocs.broadcom.com Go to and type “reporter”...