Installation Verification – Live Test (RIMU)
Power the system up and follow the standard RIMU installation
verification process to test Qube and Messaging functionality.
An installer login is available as: 6789
After completing RIMU verification the installer should also check the ELD
Indicator ( when functioning properly the Icon should be green ) by selecting
the Icon and looking at the line items checking for any warnings, malfunction
messages for the following :
o
Data recording compliance
o
Data transfer compliance
o
Engine synchronization compliance
o
Positioning compliance
o
Power compliance
o
Timing compliance
o
Data transfer data
o
Engine synchronization data
o
Missing required data elements data
o
Power data
o
Unidentified records data
Upon inspection of the Diagnostics screen each line item should read " OK "
in green text under the < State > column as shown below when functioning
properly. If warning should read " warning " in yellow text ; If malfunction
should read " malfunction " in red text.
Any failures must be called into the Verification department for live
troubleshooting.