Operation; On/Off Switch - Jefferson Professional Tools & Equipment JEFC150L10B-230 User Manual

Hide thumbs Also See for JEFC150L10B-230:
Table of Contents

Advertisement

5. SAFETY VALVE
IMPORTANT
The safety valves supplied with this equipment are designed and constructed for use exclusively with compressed air, free from impurity. The
materials used in construction are suitable for operating the valve at the rated pressure and temperatures. The viton or NBR gasket conserves
the resistance characteristics, even in prolonged use. The valve caulking is designed to impede calibration, modification or tampering. Any
modification or recalibaration of of the safety valve will nullify warranty and potentially make the equipment unsafe.
Valve installation must be performed exclusively by Jefferson approved engineers. Checking the integrity of the valve before installation is
obligatory. Also, check that the valve pressure is no greater than the operating pressure of the tank or of the system that it is installed with.
Check that the discharge flow rate of the valve is greater than the quantity of the air to discharge.
The safety valve must be positioned directly on the tank in a vertical position, in a dry, accessible place protected against the weather and far
away from liquids or condensation.
It must be positioned to allow sufficient space all around for correct air discharge, without causing damage to persons or the surrounding
area.
The valve rod must be free in its movement when discharging.
The connection between the valve and the part to be protected must be free from all kinds of choking and be as short as possible so as not
to reduce the discharge flow rate of the valve itself.
The connection passage area must be greater than the valve orifice area.
During installation screw on the valve with a torque spanner using the hexagonal part of the body.
Apply a maximum torque of 30Nm, paying attention not to cause any deformation; using pincers, pliers, hammers or tools other than a
hexagonal spanner is forbidden and will void warranty.
Check that the inlet hole and the shutter are not blocked by glue, Teflon or similar materials that could bind the shutter or other functional
components.
If the valve is replaced the compressed air contained in the system must be discharged first.
WARNING:
Jefferson Tools cannot take any responsibility for damage caused to persons and/or things due to failure to observe these instructions.

6. OPERATION

ON/OFF SWITCH

Prior to connecting the compressor to the power supply, ensure the pressure switch is on
the OFF position. On initial start-up open the reservoir condensate drain bung (A), adjust
the pressure regulator (B) to the maximum pressure. Unscrew the bung anti-clockwise to
open valve.
Pull the pressure switch (C) up to start the compressor.
Allow the machine to run for 10 minutes with the air escaping from the reservoir tank
before closing the drain bung (A).
Ensure the tank pressure reaches 8 bar as indicated on the gauge (D) before the pressure
switch shuts off the motor.
Note: When the drain bung is closed the tone from the motor will change. The compressor
motor will automatically restart when the tank pressure drops to approximately 2 bar less
than the maximum pressure.
WARNING: Never stop the compressor using the mains connection. Always switch off
the compressor by pressing the pressure switch button down. The compressed air will be
vented from the head and allowing an easy re-start.
NOTE: During correct operation a whistle of compressed air escaping/releasing will be
heard when the motor strops and a protracted whistle (approx. 20-30 seconds) whenever
the compressor is started with no pressure in the tank.
10
150L AIR COMPRESSOR
www.jeffersontools.com
USER MANUAL
JEFC150L10B-230

Advertisement

Table of Contents
loading

Table of Contents