Routine Maintenance; Replacing The Button Cell - Sungrow SH5.0RT User Manual

3-phase hybrid inverter
Hide thumbs Also See for SH5.0RT:
Table of Contents

Advertisement

User Manual

10.2.2 Routine Maintenance

I I t t e e m m
General status of
the system
Electrical
connection

10.2.3 Replacing the Button Cell

Disconnect the inverter from the grid first, then the PV strings and the battery
before any maintenance work.
Lethal voltage still exists in the inverter. Please wait at least 10 minutes and then
perform maintenance work.
There is a button cell on the inner PCB board. Contact SUNGROW for replacement when
the relevant fault alarm occurs.
Check the fastener, appearance, voltage, and resistance quarterly and annually.
M M e e t t h h o o d d
Visual check for any damage or de-
formation of the inverter.
Check any abnormal noise during
the operation.
Check each operation parameter.
Be sure that nothing covers the heat
sink of the inverter.
Check whether there is damage to the
cables, especially the surface in con-
tact with metal.
10 Troubleshooting and Maintenance
P P e e r r i i o o d d
Every 6 months
6 months after com-
missioning and then
once or twice a year.
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sh6.0rtSh8.0rtSh10rt

Table of Contents