2nd Floor
3
Tab
Front
of Base
Assembly
• Position the 2nd floor between the legs, so that the
long ledge is toward the front of the base assembly.
• Fit each of the four tabs on the 2nd floor into the
groove in each of the four legs.
Hint: You will need to flex the legs apart slightly
to fit the 2nd floor between the legs.
Grate
3rd Floor
4
Slots
Tabs
• Position the 3rd floor so that the grate faces the front of
5
the base assembly.
• Fit the slots in the 3rd floor onto the tabs on the legs.
• Push down on the 3rd floor near each slot until
you hear the four tabs "snap" into place.
BUILDING THE COMMAND CENTER
Tab
Grooves
Slots
PUSH DOWN
Tabs
Front of Base Assembly
™
5
3rd Floor
Sockets
Long
Tabs
• Position the map so that the long tabs are upright.
• At an angle, insert the long tabs on the map into
the sockets on the underside of the 3rd floor.
• Push the map forward to fit the short tabs into
the grooves in the front end of the 2nd floor.
6
Archway
Tab
3rd Floor
Tabs
Facade
Tab
• Position the archway so that the crossbeam is
upright. Fit the tabs on the archway into the slots in
the 3rd floor.
• Position the facade so that the flat side is upright.
Insert and "snap" the tabs on the facade into the
slots in the front legs.
2nd
Floor
Grooves
Map
Crossbeam
Tab
Slots
Slots
Slots
Need help?
Do you have a question about the RESCUE HEROES Command Center 72955 and is the answer not in the manual?
Questions and answers