Download Print this page

Creative Playthings Lexington Premium Pack 8 Quick Start Manual page 2

Advertisement

Gable Fan
Swing Beam
Ice Cream
Stand
Play Walls
• Install the Play Floor (SC910-800Q).
• Install the Play Walls (SC909-800Q) on front and swing
side of the tower.
• Install the Ice Cream Stand (63081-102) on the back of the
tower.
• Install the Rock Climbing Wall (AH201-102Q) in the pos-
tion shown.
• Place the access ladder and slide as shown in the picture
on the preceding page. Check spacing.
• Fasten access brackets to the inside of the ladder rails.
Secure the access ladder using the method shown in step
17 of the Lexington instructions.
• Fasten the Access Ladder Handles (AG942-400) to the
Access Ladder.
• Install the slide mount and slide using the method shown
in steps 23 and 24 of the Lexington instructions.
LEXINGTON PREMIUM PACK 8
LEXI9WPP8-100 Rev A (04-18)
Rock Climbing
Wall
• Install wall slats in the postions shown on the front page,
using the methods from the Lexington instructions. Gaps
must be narrower than 3-1/2" or wider than 9" to prevent
potential head entrapment.
• Mount one hand grip to the entrance wall slat between the
ladder and the slide. Mount the other hand grip to the adja-
cent post at the same height, using 1/4 x 1-1/2" lag screws
and 1/4" flat washers. Drill 3/16" diameter pilot holes for
the lag screws.
• Mount the Slide Handle (AG943-400) above the Super
Wave Slide.
• Install the sliding pole (AA917-603) in the position shown.
• Double-check all fasteners are secure and all recessed
hardware is covered by hole caps.
Page 2
Dormer
Sliding
pole
© Copyright 2018, Creative Playthings

Advertisement

loading
Need help?

Need help?

Do you have a question about the Lexington Premium Pack 8 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Lexi9wpp8