Operation
1
Initial situation
2
➭
Push the left-hand selector gate to the right.
3
➭
Push the right-hand selector gate in the left-hand panel to the left.
188/214
42.2
Switching operations in the bus sectionalizer panel
Coupling the busbar sections of system 1
Revision 06 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • 864-5091.9