Remove The Packaging; Installation Instructions - GE Advantium PSB9100DF Installation Instructions Manual

120v built-in speedcook ovens
Hide thumbs Also See for Advantium PSB9100DF:
Table of Contents

Advertisement

Available languages

Available languages

PREPARE THE OPENING
Installation over a Wall Oven:
27"
17-1/2"
45-1/4"
Min.
* If you are replacing an electric double oven
with the combined installation of an Advantium
120 and a single oven, use the dimensions
shown. The middle rail separating the two
openings may need to be larger than the 2"
minimum shown.
Installation Preparation
(CONT.)
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported by
2 x 4 or 1 x 2
25-1/4"
Runners all
Four Sides
2" Min.
Per Oven
Requirement
PREPARE THE OPENING
Installation over a Wall Oven and
Warming Drawer:
27"
17-1/2"
45-1/4"
Per Warming
Drawer Requirement
NOTE: Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the oven and drawer, plus additional oven
loads.

REMOVE THE PACKAGING

• Lift the oven out of the carton.
• Remove all packing material and tape.
• Open the door and remove parts box.
• Locate parts package containing mounting
screws.
7
(CONT.)
Construct
Solid Bottom
23-1/2"
Min. 3/8"
Plywood
Supported by
2 x 4 or 1 x 2
Runners all
25-1/4"
Four Sides
2" Min.
Per Oven
Requirement
2" Min.
For personal safety, the

Advertisement

Chapters

Table of Contents
loading

Table of Contents