Download Print this page

Sealey Power Products GSS150819SD Instructions Manual page 8

Galvanized steel shed

Advertisement

7. ASSEMbLY
7.1
ASSEMbLE THE REAR WALL PANELS
7.1.1 You will find it easier to assemble the shed using trestles with timber studding of equal or greater panel length.
Trestles can be supplied separately by your Jack Sealey dealership. Attach the studding to trestles with equal
overhang using nylon cable ties or similar "safe" method.
7.1.2
Place panel 1A and 1L on your work table and join them together with the 10mm long self tapping screws.
See the pre-punched holes and both diagrams.
7.1.3 Fit top and bottom channels 20B and 20C to panels by firstly sliding and finally tapping into place as indicated
by arrows in the diagrams. Note that the smaller flange on the channels should always be adjacent to the out
side face of the panel; this prevents rainwater entering the compartment of the shed. The outside face is the
top face in both diagrams.
© Jack Sealey Limited
Original Language Version
GSS150819SD
Issue: 1 - 20/08/12

Advertisement

loading