Step 1, Slide The Oven Into The Cutout; Step 2, Install Bottom Trim; Step 3, Install Mounting Screws; Step 4, Finalize Installation - GE PSB9100DF Installation Instructions Manual

Advantium 120v built-in speedcook & convection 120v built-in
Table of Contents

Advertisement

Available languages

Available languages

SLIDE THE OVEN INTO THE
1
CUTOUT
CAUTION
Two people are required
to lift the oven into the opening. Grasp the bottom
at the front and rear. DO NOT USE THE
HANDLE TO LIFT THE OVEN. DAMAGE WILL
OCCUR!
• Lift and hold the oven at the front of the
opening. Hold the oven at a 45º angle and plug
in the power cord.
• Carefully, slide the oven into the cabinet part
way. Leave the oven a few inches forward of
the cabinet frame.
• Check to be sure the power cord is not trapped
under the oven or along the sides of the oven.
Installation
INSTALL BOTTOM TRIM
2
• Align bottom trim tabs to slots in the bottom
of the oven.
• Secure the bottom trim to the bottom of the oven
using 3 brass screws provided.
INSTALL MOUNTING SCREWS
3
• Drill pilot holes through the side flanges, 2 on
each side.
• Drive the color-matched screws into the side
flange.
FINALIZE INSTALLATION
4
• Turn the power on at the source. The interior
light should come on when the door is opened.
• Refer to the Owner's Manual for operating
instructions.
7

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Psb9100sfPwb7027elPwb7027sl

Table of Contents