Preparation Stage-Recommended Tools/Instruments; Table 3-7: Recommended Tools And Instruments - Samsung U6A4 Installation Manual

Lib system for ups
Table of Contents

Advertisement

3.7 Preparation Stage—Recommended Tools/Instruments
Installers must provide these tools for installing the battery:

Table 3-7: Recommended Tools and Instruments

No.
Items
Power Screwdriver/Drill
1
(Max torque: 26Nm/270 kgf/cm)
2
Torque Limiter
3
Phillips Screwdriver or Bit
4
Box Cutter
5
Forklift
6
Insulated Torque Wrench
Insulated Sockets
7
(13 mm, 17mm and 19mm)
8
Insulated Extension for Socket
9
Inclinometer/Level
English 8/2020. Rev 0.3
Usage
To fasten SMU and SMPS assemblies to
the rack frames
(5.1–6.1Nm/50–60 kgf/cm)
For use with torque wrench
To fasten SMU and SMPS assemblies to
the rack frames
(M5 Tip)
Opening boxes
Moving rack frames and pallets
containing modules and SMU
Installing a high-current cable
(10~50 N.m / 100 ~ 500 kgf.cm)
Installing power cables and busbars
Installing a power cable
Installing a rack frame
.
3
Installing the Product
Appearance
17

Advertisement

Table of Contents
loading

Table of Contents