Huawei PDC-0038V4ACIOA-V2 Quick Installation Manual

Huawei PDC-0038V4ACIOA-V2 Quick Installation Manual

Advertisement

Quick Links

PDC-0038V4ACIOA-V2
V100R001C11
Quick Installation Guide
Issue: Draft B
Part Number: 31506178
Date: 2013-06-08
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei PDC-0038V4ACIOA-V2

  • Page 1 PDC-0038V4ACIOA-V2 V100R001C11 Quick Installation Guide Issue: Draft B Part Number: 31506178 Date: 2013-06-08 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2: Safety Precautions

    Huawei equipment, in addition to following the general precautions in this document, follow the specific safety instructions given by Huawei. Huawei will not be liable for any consequences that are caused by the violation of safety regulations and design, production, and usage standards.
  • Page 3 Appearance PDC-0038V4ACIOA-V2 PDC is short for power distribution cabinet. PDU is short for power distribution unit. UPS is short for uninterruptible power system. PDU Model PDC-0038V4ACIOA-V2 Applicable UPS UPS2000-G-3KRTL/6KRTL-V2 Weight 15 kg Dimensions 130 mm x 430 mm x 585 mm...
  • Page 4: Unpacking And Checking

    Check the PDU bar code and ensure that it complies with the order. Check against the delivery list that the types of fittings are complete and correct. If there is any discrepancy, contact the local Huawei office immediately. Transportation Safety Requirements <...
  • Page 5: Mechanical Installation

    1. Mechanical Installation Install guide rails. Bolt(#12-24,16 PCS) Guide rails Install mounting brackets, and place the PDU on the guide rails. Secure the UPS to the rack using M6x12TM screws through the holes in the mounting brackets. Do not move the PDU by holding its mounting brackets, front panel, or terminal cover.
  • Page 6: Cable Installation

    2. Cable Installation Remove the front panel of the PDU and open the circuit breakers. Loosen screws to remove the busbar cover.
  • Page 7 Connect cables. Device Tool Screw Torque M5X0.8p 1.5 N·m 3 kVA /6 kVA UPS M4X0.7p 1.3 N·m Power screwdriver  Connecting cables to the PDU for UPS2000-G-3 kVA/6 kVA system (dual-live-wire input dual-live-wire output). Configure colors for the cables prepared onsite in accordance with the local regulations. Connect cables in this sequence: AC output power cables, AC input power cables, and battery cables.
  • Page 8 Connecting cables to UPS2000-G-3 kVA or UPS2000-G-6 kVA with transformer (Dual-live-wire input Dual-live-wire output) Do not use the high voltage output port in the case of 110 V output; otherwise, devices may be damaged. Do not use the high voltage output port in the case of 110 V output;...
  • Page 9: Power-On Procedure

    The data in the menus is for reference only. The LCD figures in this document correspond to V100R001C00SPC113. If the LCD is updated, contact Huawei for the latest LCD figures.
  • Page 10 Appendix Maintenance bypass usage 1. UPS1 mains input circuit 2. UPS2 mains input circuit 3. UPS1 bypass input circuit breaker 4. UPS2 bypass input circuit breaker breaker breaker 5. UPS1 output circuit 6. UPS2 output circuit breaker 7. Maintenance bypass circuit 8.
  • Page 11 Huawei Technologies Co., Ltd. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People's Republic of China www.huawei.com...

This manual is also suitable for:

V100r001c11

Table of Contents