Maintenance
Turbine cleaning during operation
Recommended operating state for turbine wet cleaning
The following operating state has been tested and is approved by ABB
Turbo Systems:
Characteristic / component
Engine load (guide value)
Turbine inlet temperature
T
before water injection
TE
Water supply
Water pressure (overpres-
sure over atmosphere) p
If necessary, engine performance must be reduced to maintain these
conditions.
The cleaning cycle can now be started based on the following description.
Operation Manual / TPS48-D/E.. - TPS61-D/E..
5
5.3
short
water injection time
350 - 400 °C
2.0 bar
WT
Page 64
Conditions
long
water injection time
20 ... 40 %
350 - 430 °C
ensured
1.5 bar