Standard Maintenance - Sharp DV-NC100S Service Manual

Vcr/dvd combination
Hide thumbs Also See for DV-NC100S:
Table of Contents

Advertisement

Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Ref. No.
B2
Cylinder Assembly
B3
Loading Motor Assembly
B8
Pulley Assembly
B587
Tension Lever Assembly
B31
ACE Head Assembly
B573, B574
Reel S, Reel T
B37
Capstan Motor
B52
Cap Belt
B73
FE Head
B86
F Brake Assembly (HI)
B133
Idler Assembly (HI)
B410
Pinch Arm Assembly
B414
M Brake (SP) Assembly (HI)
B416
M Brake (TU) Assembly (HI)
B525
LDG Belt
Notes:
1. Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2. After cleaning the parts, do all DECK ADJUSTMENTS.
3. For the reference numbers listed above, refer to Deck Exploded Views.

STANDARD MAINTENANCE

Deck
Part Name
H: Hours
Periodic Service Schedule
1,000 H
2,000 H
2-1-1
: Cleaning
: Replace
3,000 H
4,000 H
H9740MEN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv-nc100ssDv-nc100sqDv-nc100syDv-nc100sr

Table of Contents