01FEb 716330320 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. NP101267 LM101267 Gloves must be worn at all times to reduce SE101267 WL101267 risk of injury! SE101267EU NP101267H4 10’ x 12’ Nominal Size Base 121” x 143 1/4” Size 307,3 cm x 363,9 cm...
Page 2
SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
Page 5
What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
Page 6
06Aa What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
Page 7
HARDWARE LIST... 07BGa Hardware Views by Key No. Part Part Qty. Description #2 Phillips #2 Phillips List 11/32 Hex. 65103 Hex Nut (#8-32) 65900A Black Screw (#10B x 1/2) (13 mm) 65923 Bolt (#8-32 x 3/8) (10 mm) 65004 Screw (#8AB x 5/16) (8 mm) #2 Phillips 66045 Door Handle...
Page 8
PARTS LIST... 08BG Selected End Views by Key No. Part Description Part No. Qty. List 3719 Door Handle Brace 6635 Gable Brace 9365 Front Wall Channel 10497 Horizontal Door Brace 5986 Rear Wall Angle 8&9 6000 Right Gable 6001 Left Gable 6014 Side Roof Trim 6015...
ASSEMBLY OVERVIEW 11AW Install Corners, Wall Angles, and Door Build the Floor Frame Track Attach Gables and Roof Beams Install Wall Panels, Wall Channels, and Door Jambs Install Roof Panels, Ridge Cap, Side Install Doors Trim, and Corner Cap Shed is now complete.
Page 12
CONSTRUCTING A BASE... 12AW No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an eff ective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
Page 13
Step 1: Floor Frames 13AW Washers are to be used on painted parts only. You will need for this page: 10392 Washers are not necessary on unpainted parts and there are not enough to use on every screw and bolt. Side Floor (QTY: 8) Frame...
Page 14
Step 1: Continued You will need for this page: 8936 Rear Floor (QTY: 5) Frame 8936 Assemble the Rear Floor Frames. Overlap two (2) Rear Floor Frames as shown and secure with fi ve (5) bolts. Two (2) bolts must enter from bottom. Check that the fi...
Page 15
Step 1: Continued You will need for this page: 119 3/8” 303,2 cm 9367 8934 Finished Length Front Floor Ramp (QTY: 8) Frame Overlap Length 7 3/8” 18,7 cm 9367 Overlap the Ramp and two (2) Front Floor 8934 Frames so that four (4) holes align at each end as shown.
Page 16
Step 2: Wall Frames 16AW You will need for this page: 5986 10389 Rear Channel Rear Angle (QTY: 9) 5986 5986 10389 Overlap two (2) Rear Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole.
Page 17
Step 2: Continued 17AW You will need for this page: 10390 10393 140 3/8” 356,6 cm Finished Length Side Channel Side Angle (QTY: 18) Overlap two (2) Side Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole.
Page 18
Step 3: Roof Beams 18AWa You will need for this page: 10568 10568 BUILD TWO (2) BEAMS Roof Beam (QTY: 16) Overlap two (2) Roof Beams so that the bottom slots align as shown. Insert six (6) bolts and nuts as shown below. Insert two (2) bolts and nuts into slots on bottom of the Beam as shown.
Page 19
Step 3: Continued 19AW You will need for this page: 10568 142 3/8” 361,6 cm Overlap Length 6 1/8” 15,6 cm Finished Length Roof Beam (QTY: 14) Overlap two (2) Roof Beams so that bottom slots align but DO NOT INSERT BOLTS. Next, overlap two (2) more Roof Beams to form a second Roof Beam Assembly.
Step 4: Door Track You will need for this page: END VIEW 6403 9366 CORRECT INCORRECT Long Leg Track Splice (QTY: 4) Door Track Door Slide on top. (Painted) Insert screws into bottom side only. The Gables will fasten to the Door Track using the holes on the top side. Door Slide Align two (2) Door Tracks with the four (4) holes in the bottom of the Door Track Splice...
Step 5: Frame Assembly You will need for this page: Assemblies from Step 1: • Front Floor Assembly (1) • Side Floor Assembly (2) • Rear Floor Assembly (1) (QTY: 8) (QTY: 2) Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
Page 22
Step 6: Corners 22AW You will need for this page: 6627 9374 6633 (QTY: 38) (QTY: 4) Corner Panel Wall Panel Front Panel Place washers on all bolts and screws used 6627 6627 on painted parts. 6633 6633 Use one person to support the Corner while another secures the Panels.
Page 23
Step 7: Wall Framing 23AW You will need for this page: Assemblies from Step 2 and Step 4: • Rear Wall Angle Assembly (1) • Side Wall Angle Assemblies (2) • Door Track Assembly (1) (QTY: 30) • Install one Side Wall Angle Assembly fi rst. •...
Page 24
Step 8: Wall Panels 24AW FASTEN TO WALL ANGLES You will need for this page: 6627 [ NO HARDWARE NEEDED FOR THIS STEP ] Wall Panel Lay out all Panels in the positions shown below. FASTEN TO WALL CHANNELS (STEP 10) Use the diagram to the right when attaching Wall Panels.
Page 25
Step 8: Continued 25AW You will need for this page: Use bolts to attach Wall Panels (QTY: 84) (QTY: 13) where Rear Wall Angles overlap. Working one side at a time, lift the Panels into place and secure top and bottom of Panels with screws.
Page 26
Step 9: Door Jambs 26AW You will need for this page: 9370 Door Jamb (QTY: 8) (QTY: 4) Secure Door Jambs with two (2) screws in the top and bottom of each Panel as shown. Insert two (2) bolts and nuts into the back side of each Panel as shown below.
Page 27
Step 10: Wall Channels 27AW You will need for this page: 9365 Assemblies from Step 2: • Rear Wall Channel Assembly (1) • Side Wall Channel Assemblies (2) Front Channel (QTY: 66) (QTY: 4) Install Rear Wall Channel by placing screws through all remaining holes in Wall Panels.
Page 28
Step 11: Gables 28AW You will need for this page: 6001 6000 5971 (QTY: 8) Left Gable Right Gable Bracket GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MIS- TAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim (Plastic) Edge Trim MUST cover Gable edge.
Page 29
Step 11: Continued 29AW You will need for this page: 6635 (QTY: 8) (QTY: 3) Gable Brace Gable must fi t UNDER Side Wall Angle at corner. Working with one Gable at a time, attach the Rear Gables to the Rear Wall Angle with screws.
Page 30
Step 11: Continued 30AW You will need for this page: 6635 (QTY: 12) (QTY: 2) Gable Brace Track Sup. Working with one Gable at a time, attach the front Gables to the Door Leave two (2) holes open on each side of the Gable peak to attach Track Support.
Page 31
Step 12: Roof Framing 31AW You will need for this page: Assemblies from Step 3: • Main Roof Beam Assembly (1) • Single Roof Beam Assemblies (2) (QTY: 12) Seal the gap between the Gables using the weather stripping tape as Top View of Gables shown.
Page 32
Roof Install Prep Page 32BG Use the information on this page to complete steps 13 thru 14. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up.
Step 13: Roof Assembly 33BG You will need for this page: 6641 6640 67545 Weather Left Roof Right Roof (QTY: 10) (QTY: 16) Panel Stripping Panel Attach Back Right Roof Panel to Top Roof Beam only using four (4) screws. Remove Edge Trim from the Left Gable under the Roof Panel.
Page 34
Step 13: Continued 34BG You will need for this page: 6529 6869 Ridge Cap Roof Panel (QTY: 16) (QTY: 4) FASTEN TO RIDGE CAP (NEXT TWO PAGES) Continue to apply weather stripping. Attach two (2) Roof Panels using the diagram to the right while assembling the roof.
Page 35
Step 13: Continued 35BG You will need for this page: 6529 6868 Ridge Cap Roof Panel (QTY: 16) (QTY: 4) FASTEN TO RIDGE CAP (NEXT TWO PAGES) Continue to apply weather stripping. Attach two (2) Roof Panels using the diagram to the right while assembling the roof.
Page 36
Step 13: Continued 36BG You will need for this page: 6869 6529 6641 6640 Right Roof Left Roof (QTY: 72) (QTY: 18) Roof Panel Ridge Cap Panel Panel Continue to apply weather stripping. Attach Roof Panels, one at a time, to Roof Beams using eight (8) screws per Panel.
Page 37
Step 14: Roof Trim 38AW You will need for this page: 6015 6014 (QTY: 4) (QTY: 8) (QTY: 4) Roof Trim Roof Trim Trim Cap (L) Trim Cap (R) Slide Peak Cap legs under Ridge Cap and Peak Cap secure with two (2) bolts and nuts on each end.
Step 15: Door Assembly 39AW You will need for this page: 10477 3719 6300 Door Handle Brace (QTY: 3) Vert. Brace (QTY: 2) Handle Do not fully tighten the bolts that hold Attach the Door Handle and Door on the Door Handle until the Vertical Handle Brace to the Door with two Door Brace is in place.
Page 39
Step 15: Continued 40AW You will need for this page: 10497 Horiz. Brace (QTY: 6) Door Guide Slide Horizontal Brace over Door edge and secure with one (1) bolt and nut in top and bottom. Secure the Door Guides and Lower Horizontal Door Brace as shown below.
Page 40
Step 16: Door Install 41AW You will need for this page: Assemblies from Step 16: • Right Door Assembly (1) • Left Door Assembly (1) (QTY: 8) Gable Door Slide From inside the building, place the bottom of the Door into the Front Floor Frame track at about the half-open position.
Page 41
ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
Page 42
CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.
ARROW ACCESSORIES... ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces MODELS FB47410, FB5465, designed for added protection against FB106-A, FB109-A and FB1014-A heavy snow accumulation. Increases the strength of your roof. A simple fl oor frame system made of heavy-duty, hot-dipped BEFORE AFTER galvanized steel.