Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions Bollard PSY414 LED PSY424 LED PTY414 LED PTY424 LED Do not open during installation Surge Protection This product is factory-sealed. This product features built-in surge protection circuitry in compliance with Refer to the instructions contained in this applicable standards.
Page 2
Bollard PSY414 PTY414 ø 14.5 PSY424 PTY424 1000 ø 14.5 IP66, IK10, Class I, ta = 40°C Accessories: Planted root – Galvanised steel. Weight ESV2 for PSY414/424 300-9115 for PSY414 13.3 ESV2 for PTY414/424 300-9115 for PSY424 16.1 for PTY414 13.3 for PTY424 19.0...
Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners. In case of component failure due to abnormal circumstances or at end of life, replacement must be carried out Warning: Do not open luminaire while mains supply is switched on.
Installation The product must be installed and maintained by a building/construction and/or electrical regulations and relevant legislation. Warning: Switch off mains electrical supply prior to installing and connecting the luminaire. Notice: than the original manufacturer, then the warranty will no longer be valid and shall become the full respon- sibility of the modifying person/organisation.
Installation Procedure It is recommended to incorporate the optional planted root to ensure maximum stability. 1) Switch off mains electrical supply. 2) Remove sleeve A from post B. 4) Lift tabs H and remove terminal box cover C plate E with M12 bolts/nuts to ground. Ensure as shown.
Page 6
5) Check that rating shown on luminaire label 6) Pull cable D (and second cable for through wir- conforms with mains electrical supply. ing, if required) through membrane spout(s) F and terminate in terminal block G. Lock cable(s) 08/18 IP66 with strain relief(s).
Page 7
9) Engage sleeve A 10) Remove countersunk screws J from head K with (good and bad engagement). Torx 25 tool (supplied by WE-EF). 11) Hold head K under arm. Grab socket L, connect 12) Place head K over sleeve A and check for and tighten with plug M.
Page 8
13) Tighten recessed screws N gradually in 14) Return countersunk screws J into head and alternating sequence (6 Nm) with Torx 30 tool tighten. (supplied by WE-EF).
Installation Instruction 1) Note: It is the responsibility to installer to 2) Please note, ESV4 must be orientated correctly ensure the suitability of the ESV planted root for different products. In both instances conduit for any local or national structural requirements entry can be rotated to match cable routing.
Page 14
5) Orientate ESV as required and t electrical 6) Place the ESV in the form work for concrete connections/conduit. pad, ensuring orientation, position and levels are correct. Ensure all openings on ESV are blanked off, including mounting plate hole. 7) Fit the nominated bolts through mounting 8) Pour concrete to desired level depending on ange.
Page 15
9) After concrete has cured for speci ed time, remove blanking and bolts. Install tting (as per luminaire instructions) onto mounting ange.
Need help?
Do you have a question about the PSY424 LED and is the answer not in the manual?
Questions and answers