Download Print this page

ABB GE SPST480 Instructions

Power break ii circuit breaker accessories

Advertisement

Quick Links

1
GEH6519 INSTRUCTIONS
Power Break® II Circuit Breaker Accessories
Shunt Trip and Shunt Trip with Lockout 480& 600Vac
Introduction
The Shunt Trip and Shunt Trip with Lockout accessories,
shown in Figure1, can be installed in 800-4000 ampere frame
Power Break® II circuit breakers. These accessories allow the
breaker to be tripped electrically from a remote location.
In addition to providing a trip signal to the breaker, the Shunt
Trip accessories can be set up to interact with other Power
Break II accessories, when used with a MicroVersaTrip Plus or
MicroVersaTripPM Trip Unit. DIP switches on the rear of the
breaker Trip Unit can configure the Shunt Trip accessories to
activate a Bell Alarm-Alarm Only accessory or a Bell Alarm
with Lock out accessory when a shunt trip occurs. The
Accessory Configuration section below describes how this can
be done. If the breaker is equipped with a Power+Trip Unit, it
is configured so that only protection trips will activate a Bell
Alarm ­ Alarm Only or Bell Alarm with Lockout.
The catalog numbers for the Shunt Trip and Shunt Trip with
Lockout for 480 and 600Vac are listed in Table 1. Voltage and
current ratings in Table1 are given at the input of the
transformer. The voltage and current ratings of the input to
the accessory are equal to that of the 120Vac version of the
accessory. Table 2 Iists these ratings.
Operation
Apply control voltage to the primary of the supplied step-
down transformer. The secondary of the transformer is
connected to terminals 31 and 32 of the terminal strip on the
right side of the breaker.
WARNING: 480 Vac and 600 Vac Shunt Trip accessories
must be used with the supplied step-down transformer
AVERTISSEMENT: Les modules de déclenchement shunt
480 Vac et 600 Vac doivent être utilisés avec le
transformateur abaisseur de tension qui est fourni.
The Shunt Trip or Shunt Trip with Lockout will cause the
circuit breaker to trip when the control voltage is greater
than 55% of the rated ac value. Control power to the Shunt
Trip must be removed before the breaker can be closed.
Control power to the Shunt Trip with Lockout must be
removed for a minimum of 0.25 second before the breaker
can be closed.
Figure 1. Shunt Trip with Lockout
Voltage
Catalog
Rating (1)
Number
480 Vac
SPST480
SPST600
600 Vac
SPSTL480
480 Vac
SPSTL600
600 Vac
Rated for 50/60 Hz. Rating is 120 Vac without
(1)
step-down transformer.
(2)
Peak inrush current is present for 2-6 ms after activation. This
number is provided so that fuses and supplies can be chosen
appropriately.
Table 1. Catalog numbers and voltages for the Shunt Trip and Shunt Trip with Lockout
Voltage
Accessory
Rating
Shunt Trip
120 Vac
Shunt Trip/
120 Vac
Lockout
Table 2 Voltage and current ratings for the 120 Vac Shunt Trip and Shunt Trip with
Lockout.
Installation
WARNING: Before installing any accessories, turn the
breaker OFF, disconnect it from all voltage sources, and
discharge the charging springs.
AVERTISSEMENT: Avant d'installer tout accessoire, mettre
le disjoncteur en position OFF, le d éconnecter de
toute tension
d'alimentation,
ressorts d'armement.
Peak Inrush
Nominal RMS
Current, mA(2)
Current, mA
375
21
300
750
20
600
16
Peak Inrush
Nominal RMS
Current, A
Current, mA
1.5
85
3
80
et
d é charger
les

Advertisement

loading

Summary of Contents for ABB GE SPST480

  • Page 1 GEH6519 INSTRUCTIONS Power Break® II Circuit Breaker Accessories Shunt Trip and Shunt Trip with Lockout 480& 600Vac Introduction The Shunt Trip and Shunt Trip with Lockout accessories, shown in Figure1, can be installed in 800-4000 ampere frame Power Break® II circuit breakers. These accessories allow the breaker to be tripped electrically from a remote location.
  • Page 2 The Shunt Trip or Shunt Trip with Lockout is installed in the shunt trip occurs, with the procedure described in accessory compartment through the front of the circuit the Accessory Configuration section. breaker in the position shown in Figure 2. Mount the supplied step-down transformer near the circuit breaker.
  • Page 3 Procedure for Changing Switch Settings Description of Switch Settings Change the accessory switch settings the with the following Following are descriptions of the effects of each accessory procedure: switch when it is enabled. When a Shunt Trip accessory causes the breaker to trip, WARNING: Before beginning this procedure, turn the the contacts of the Bell Alarm-Alarm Only also change breaker off, disconnect it from all voltage sources, and...
  • Page 4 We reserve the right to make technical We reserve all rights in this document and 305 Gregson Drive by ABB Inc. under license from GE. changes or modify the contents of this in the subject matter and illustrations Cary, NC 27511.

This manual is also suitable for:

Ge spst600Ge spstl480Ge spstl600